HUD PIH Notice § 2017-21

Implementation Guidance: Housing Opportunity Through Modernization Act of 2016 (HOTMA) -- Housing Choice Voucher (HCV) and Project-Based Voucher (PBV) Provisions (HUD PIH Notices)

HUD guidance — not codified law
In Force
Verified 10/14/2026 · Next check 10/21/2026
effective 10/6/2026FederalAffordable Housing Programs

Operative Text

HUD PIH Notice § 2017-21
                           U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
                                        WASHINGTON, DC 20410-5000

OFFICE OF PUBLIC AND INDIAN HOUSING




SPECIAL ATTENTION OF:                               NOTICE PIH 2017–21 (HA)
Public Housing Agencies                             Issued: October 30, 2017
Public Housing Agencies that                        This notice remains in effect until amended,
Administer the Housing Choice                       superseded, or rescinded
Voucher Program; Owners;
Other Grantees                                      CROSS REFERENCES
                                                    Notice PIH 2009–51
                                                    Notice PIH 2011–28
                                                    Notice PIH 2011–65 (HA)
                                                    Notice PIH 2012–21 (HA)
                                                    Notice PIH 2012–32 (HA) H 2017–03, REV-3
                                                    Notice PIH 2013–27
                                                    Notice PIH 2015–18
                                                    Notice PIH 2016–05
                                                    SUPERSEDES
                                                    Notice PIH 2002–22
                                                    Notice PIH 2006–16
                                                    Notice PIH 2011–54
                                                    Notice PIH 2015–05
                                                    Notice PIH 2015–10

Subject: Implementation Guidance: Housing Opportunity Through Modernization Act of
2016 (HOTMA) — Housing Choice Voucher (HCV) and Project-Based Voucher (PBV)
Provisions
I.       Purpose
         The Housing Opportunity Through Modernization Act of 2016 (HOTMA) made
         changes to both the definition of PHA-owned housing (for project-based and tenant-
         based vouchers) and the project-based voucher (PBV) program. This notice provides
         guidance on those changes. The provisions covered by this notice were implemented
         through a Federal Register (FR) notice (82 FR 5458) published on January 18, 2017.
         HUD then published a follow-up notice at 82 FR 32461 on July, 14, 2017, with
         technical corrections and clarifications to the January 18, 2017, notice (see Part IV
         below). The January 18, 2017, notice, as revised by the technical correction notice, is
         referred to as the “January 18, 2017, implementation notice” throughout this notice.
       To consolidate PBV guidance, HUD has incorporated content from previous PBV
       notices into this notice. See Section V, below, for a list of such notices.
II.    Background
       On July 29, 2016, HOTMA was signed into law (Public Law 114–201, 130 Stat. 782).
       HOTMA made numerous changes to statutes that govern HUD programs, including
       section 8 of the United States Housing Act of 1937 (“the Act”) (42 U.S.C. 1437f). On
       January 18, 2017, HUD published a notice (82 FR 5458) to implement various HCV
       provisions, including a new statutory definition of PHA-owned housing (§105 of
       HOTMA) and changes to the PBV program (§106 of HOTMA). The provisions went
       into effect on April 18, 2017. This PIH notice provides further guidance on the
       implementation of these provisions.
       The January 18, 2017, implementation notice also implemented two provisions related
       to inspections for HCV tenant-based and PBV assistance (§101(a)(1) of HOTMA) (see
       Notice PIH 2017–20, issued October 27, 2017) and a change to the HCV housing
       assistance payment (HAP) calculation for families who own manufactured housing
       and are renting the manufactured home space (§112 of HOTMA) (guidance will be
       published separately).
       The following HOTMA provisions relating to the PBV program were not implemented
       by the January 18, 2017, implementation notice and consequently are not covered in
       this notice:
       1. Section 106(a)(4)(iii), authorizing a PHA to enter into a PBV HAP Contract for
          any unit that does not qualify as existing housing and is under construction or
          recently has been constructed regardless of whether the PHA and owner executed
          an Agreement to Enter a Housing Assistance Payments Contract (AHAP);
       2. Section 106(a)(6), authorizing for the use of an operating cost adjustment factor to
          adjust PBV contract rents;
       3. Section 106(a)(7), authorizing the use of owner-maintained, site-based waiting lists
          for PBV units; and
       4. Section 106(a)(8), concerning the environmental review requirements for existing
          housing.
III.   Structure
       This notice is comprised of attachments and appendices. Each attachment follows a
       uniform structure:
       1.     Title
       2.     Regulation
       3.     HOTMA Reference
       4.     Applicable Program(s)
       5.     Summary of Change
       6.     Content


                                         page 2 of 66
IV.   Summary of Technical Corrections
      The July, 14, 2017, notice published at 82 FR 32461 (“technical correction notice”)
      corrected several typographic errors and made the following technical corrections and
      clarifications to the January 18, 2017, implementation notice. All of the corrections
      and clarifications are reflected in the respective attachments to this PIH notice and are
      summarized here in the order in which they appear in this notice solely for the sake of
      convenience:
      1.     PHA-Owned Units (Attachment A). The original notice used the phrase “50
             percent or more” to define a level of control that constitutes a controlling
             interest and would thus indicate PHA ownership. The technical correction
             notice replaces that phrase with “more than 50 percent.”
      2.     Percentage Limitation (Program Cap) (Attachment C). The original notice
             stated that new construction units will qualify for replacement housing if they
             are located on the “site of the original public housing development.” The
             technical correction notice strikes the phrase “public housing,” making clear
             that the requirement applies broadly to all covered forms of housing assistance
             that are excluded from the percentage limitation.
      3.     Income-Mixing Requirement (Project Cap) (Attachment E).
             a.      Supportive services. HOTMA provides that a family can no longer be
                     required to participate in supportive services as a condition of living in
                     a unit in order for that unit to meet the supportive services exception.
                     The technical correction clarifies therefore that a PHA may not rely
                     solely on a supportive services program that requires a family to engage
                     in supportive services, such as the Family Self-Sufficiency (FSS)
                     program, in order for the unit to meet the supportive services exception.
                     Also, the original noticed stated that if a family “fails to successfully
                     complete the FSS contract of participation or supportive services
                     objective and consequently is no longer eligible for the supportive
                     services, the family must vacate the unit…and the PHA shall cease
                     paying housing assistance payments.” HUD determined that this
                     provision could be wrongly construed in a way that conflicts with
                     current FSS requirements, which do not allow termination from the
                     housing assistance program for failure to complete the FSS contract.
             b.      25 percent cap. The technical correction notice clarifies that the
                     income-mixing cap for projects that are in a census tract with a poverty
                     rate of 20 percent or less is increased from 25 to 40 percent.
             c.      Definition of new construction. The technical correction notice makes
                     the definition of new construction units that qualify for an exception to
                     the project cap the same as the definition for new construction that
                     applies to the exception for the PBV percentage limitation.
      4.     Units Not Subject to Percentage Limitation or Income-Mixing Requirement
             (Attachment F). The original notice excluded from the list of excepted units
             those units that received assistance under section 201 of the Housing and


                                         page 3 of 66
            Community Development Amendments of 1978 (Flexible Subsidy program).
            The technical correction notice clarifies that such units are excepted from both
            the percentage limitation and the income-mixing requirement.
     5.     Attaching PBV to Certain PHA-Owned Projects Without Following a
            Competitive Process (Attachment L). The original notice applied a per-unit
            cost rehabilitation threshold to all replacement housing, including existing
            housing. The technical correction notice makes clear that there is no per-unit
            cost requirement for existing housing owned or controlled by a PHA.
V.   Notices Superseded by this Notice
     To consolidate PBV guidance, the Department has incorporated content from previous
     PBV notices into this notice. Specifically, this notice supersedes PIH Notices 2002–
     22, 2006–16, 2011–54, 2015–05, and 2015–10 in their entirety, as described below:
     1.     Notice PIH 2002–22 (Units with Low-Income Housing Tax Credit Allocations
            Combined with Housing Choice Voucher Assistance under the Tenant-Based
            and Project-Based Programs). This notice is rescinded. The provisions of PIH
            2002–22 (which were promulgated before HUD had implemented a PBV
            regulation) align with current PBV regulations, and are thus no longer
            necessary in a notice. PBV rents for Low Income Housing Tax Credit (LIHTC)
            units under existing and prospective PBV HAP contracts are determined in
            accordance with PBV regulations at 24 CFR §983.301.
     2.     Notice PIH 2006–16 (Project-Based Voucher Units with Low-Income Housing
            Tax Credit Allocations). This notice is rescinded. The “grandfathering” of PBV
            projects under PIH 2006–16 is no longer necessary, because PBV rents are no
            longer capped at the LIHTC rent as they once were. PBV rents for LIHTC
            units under existing and prospective PBV HAP contracts are determined in
            accordance with PBV regulations at 24 CFR §983.301.
     3.     Notice PIH 2011–54 (Guidance on the Project-Based Voucher Program):
            a.     “PHA-owned units” is revised by HOTMA, in which a statutory
                   definition of such units was enacted. (Attachment A)
            b.     “Proposal Selection Process” is revised by HOTMA to authorize a PHA
                   to attach PBV assistance to certain PHA-owned projects without
                   following a competitive process. (Attachment L)
            c.     Most remaining portions of Notice PIH 2011–54 are unchanged by
                   HOTMA and are included as an appendix to this notice. Note that
                   additional PBV provisions not covered in PIH 2011–54 are also
                   included as part of Appendix II. (Appendix II)
     4.     Notice PIH 2015–05 (Project-Based Voucher (PBV) Guidance):
            a.     “Section I – Timely Reporting of the Family Report (form HUD-50058
                   and form HUD 50058 MTW) into the Inventory Management
                   System/Public Indian Housing Information Center (IMS/PIC) and
                   Timely Submission Into the Voucher Management System (VMS) for


                                       page 4 of 66
                      Project Based Vouchers” is adopted with updates to VMS reporting per
                      VMS User’s Manual release 8.9.0.0 (April 2016). (Appendix III)
              b.      “Section II – Maximum Amount of PBV Assistance (20 Percent Limit)
                      in the PBV Program and PHA Submission requirements under 24 CFR
                      983.6(d)” is superseded by HOTMA, under which a PHA may project-
                      base up to 20 percent of its Consolidated Annual Contributions
                      Contract authorized units, instead of 20 percent of its voucher budget
                      authority. This notice revises the requirements for PHA notification to
                      HUD of the intent to project-base. (Attachments C and D)
              c.      “Section III – PHA-Owned Units under the PBV Program” is
                      superseded by HOTMA, which revises the definition of PHA-owned
                      units. This notice also covers the role of the independent entity with
                      respect to PHA-owned units. (Attachments A and B)
       5.     Notice PIH 2015–10 (Project-Basing HUD-Veterans Affairs Supportive
              Housing (VASH) Vouchers. HOTMA authorizes PHAs to project-base Family
              Unification Program (FUP) and HUD-Veterans Affairs Supportive Housing
              (VASH) vouchers without requiring additional HUD approval. Prior to
              HOTMA, PHAs were prohibited from project-basing vouchers awarded for
              FUP. HUD-VASH vouchers could be project-based, but required HUD review
              and approval in accordance with Notice PIH 2015–10 (this applied to HUD-
              VASH vouchers the PHA chose to project-base and not to HUD-VASH units
              awarded under a HUD-VASH PBV allocation as described in Attachment F of
              this notice). This notice supersedes PIH 2015–10 in its entirety.
VI.    Applicability to Moving to Work (MTW) Agencies
       This notice applies generally to MTW agencies. With respect to any individual MTW
       agency that is required to submit an Annual MTW Plan to HUD for approval, any
       specific regulatory provisions addressed in this notice that have been waived as part of
       the agency’s approved Annual MTW Plan do not apply to that agency.
VII.   Paperwork Reduction Act
       In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501–3520), an
       agency may not conduct or sponsor, and a person is not required to respond to, a
       collection of information, unless the collection displays a currently valid OMB control
       number. The information collection requirements of this notice were assigned OMB
       Control Number 2577–0169.


                                             ____________________________
                                             Dominique Blom
                                             General Deputy Assistant Secretary
                                              for Public and Indian Housing




                                          page 5 of 66
Table of Contents
Table of Contents ........................................................................................................................ 6
Attachments ................................................................................................................................ 8
Attachment A: PHA-Owned Units ............................................................................................. 9
       PHA-Owned Project: Example ......................................................................................... 10
Attachment B: PHA-Owned Units and Independent Entities ................................................... 12
       Table 1: Overview of Independent Entity Functions ........................................................ 13
Attachment C: Percentage Limitation (Program Cap) and
   PHA Submission Requirements .......................................................................................... 18
Attachment D: PBV Percentage Limitation — 10 Percent Increase for Eligible Units ........... 20
Attachment E: Income-Mixing Requirement (Project Cap) ..................................................... 25
       Project Cap: Example ........................................................................................................ 25
       Exceptions to Project Cap: Example ................................................................................. 26
       Increased Project Cap: Example........................................................................................ 29
       Effect on Existing Contracts: Example ............................................................................. 29
Attachment F: Units Not Subject to Percentage Limitation (Program Cap) or
   Income-Mixing Requirement (Project Cap) ....................................................................... 31
Attachment G: PBV HAP Contract: Initial Term and Extensions ............................................ 36
       Scenario 1 .......................................................................................................................... 37
       Scenario 2 .......................................................................................................................... 38
       Scenario 3 .......................................................................................................................... 38
       Scenario 4 .......................................................................................................................... 39
Attachment H: Priority of PBV HAP Contracts ....................................................................... 41
Attachment I: PBV Biennial Inspections .................................................................................. 42
Attachment J: Adding Units to PBV HAP Contract Without Competition .............................. 43
Attachment K: PBV Contract Termination or Expiration without Extension .......................... 45
Attachment L: Attaching PBVs to Certain PHA-Owned Projects Without Following a
   Competitive Process............................................................................................................ 48
Attachment M: Project-Basing Family Unification Program and
   HUD-VASH Vouchers ....................................................................................................... 50
Appendices ................................................................................................................................ 52
   Appendix I. PBV Program Cap Calculation Instructions ..................................................... 53
   Appendix II. PHA Plan, Administrative Plan, and Other PBV Topics ................................ 56
   Appendix III. Reporting ........................................................................................................ 61

                                                               page 6 of 66
Appendix IV. HCV, Homeownership, and PBV Inspection Requirements ......................... 64
  Table 1: HCV Inspection Requirements Not Applicable to the PBV Program ................ 64
  Table 2: HCV Inspection Requirements Not Applicable to the Homeownership Option 65




                                        page 7 of 66
Attachments




              page 8 of 66
Attachment A: PHA-Owned Units
Regulation: 24 CFR §983.3, 24 CFR §982.352, and 24 CFR §982.628(d)
HOTMA Reference: Sec. 105, which amends Sec. 8(o)(11) of the Act
Applicable Programs: HCV (including the Homeownership Option) and PBV
Summary of Change: HOTMA defines the term “owned by a PHA,” overriding the
definition of PHA-owned units previously established in regulation under 24 CFR §983.3, 24
CFR §982.352, and 24 CFR §982.628(d). This Attachment A and Attachment B supersede
Notice PIH 2015–05, Section III, in its entirety.
Content: For a unit that is PHA-owned according to the HOTMA definition, a PHA must
identify and use an independent entity to perform certain functions. Attachment B of this
notice discusses the responsibilities of independent entities for PHA-owned units.
The provisions of this Attachment A apply to the PBV program and to the HCV program
(including the Homeownership Option), except where otherwise noted.
(1)    Definition of PHA-owned units. In accordance with HOTMA, a unit is “owned by a
       PHA” if the unit is in a project that is:
       (a)    Owned by the PHA (which includes a PHA having a “controlling interest” in
              the entity that owns the unit);
       (b)    Owned by an entity wholly controlled by the PHA; or
       (c)    Owned by a limited liability company (LLC) or limited partnership in which
              the PHA (or an entity wholly controlled by the PHA) holds a controlling
              interest in the managing member or general partner.
       “Controlling interest” means:
       (a)    Holding more than 50 percent of the stock of any corporation; or
       (b)    Having the power to appoint more than 50 percent of the members of the board
              of directors of a non-stock corporation (such as a non-profit corporation); or
       (c)    Where more than 50 percent of the members of the board of directors of any
              corporation also serve as directors, officers, or employees of the PHA; or
       (d)    Holding more than 50 percent of all managing member interests in an LLC; or
       (e)    Holding more than 50 percent of all general partner interests in a partnership;
              or
       (f)    Having equivalent levels of control in other ownership structures. Most
              ownership structures are already covered in the categories listed above. This
              last category is meant to cover any ownership structure not already listed in the
              categories above. Also, under this category (f), a PHA must have more than 50
              percent control in that ownership structure (an equivalent level of control) for
              the project to be considered PHA-owned.




                                         page 9 of 66
                                PHA-Owned Project: Example

                 PHA A holds more than 50 percent of the stock in ABC
                 Projects, and ABC Projects is a corporation that owns the
                 project to which PBV assistance will be attached. In this case,
                 the project is considered PHA-owned.

(2)   Units not PHA-owned. The previous definition of PHA-owned (as established in
      regulation) was more expansive than the HOTMA definition. Under the previous
      definition, if a PHA held any interest (direct or indirect) in a project, then the project
      was considered to be PHA-owned. The following list offers examples of scenarios
      under which a unit is not considered to be PHA-owned under the HOTMA definition:
      (a)    The PHA holds a fee interest as ground lessor of the property on which the
             building is situated, but no ownership interest in the building or unit itself.
      (b)    The PHA holds only a security interest under a mortgage or deed of trust on the
             unit; or
      (c)    The PHA has only a non-controlling interest in an entity that owns the unit or
             in the managing member or general partner of an entity that owns the unit.
             Following the example above, assume PHA A holds only 45 percent of ABC
             Project’s stocks, which is below the threshold that constitutes a controlling
             interest in the corporation that owns the project. In this case, the project is not
             considered to be PHA-owned.
      As it relates to the PBV program, the new section 8(o)(13)(N) of the Act allows a PHA
      to attach PBVs to a project in which the PHA has an ownership interest or over which
      the PHA has control, without following a competitive process, but only in cases in
      which the PHA is engaged in an initiative to improve, develop, or replace a public
      housing property or site. In this context, the PHA’s ownership interest does not have to
      meet the definition of the term “owned by a PHA” established by section 105 of
      HOTMA. Information on what constitutes an ownership interest or control for
      purposes of section 8(o)(13)(N) is found in Attachment L of this notice.
(3)   Classifying a unit as not PHA-owned. The new definition of PHA-owned is in effect
      as of April 18, 2017, and applies to all PBV projects. An opinion from the PHA’s legal
      counsel that a unit is not PHA-owned is required under the following two scenarios:
      (a)    The change in definition results in a project that was PHA-owned under the
             previous definition and was under HAP or AHAP before April 18, 2017, to no
             longer be PHA-owned.
      (b)    A change in ownership structure results in a project no longer meeting the
             definition of PHA-owned in effect as of April 18, 2017.
      The project remains classified as PHA-owned for purposes of program requirements
      and monitoring until the PHA obtains an opinion from its legal counsel that the project
      is no longer PHA-owned for a project that fits into one of the above two categories.
      Except for the two instances described above, a PHA is not required to obtain a legal
      opinion when determining if a unit is PHA-owned. Once the legal opinion has been


                                          page 10 of 66
      obtained, the PHA is no longer required to use an independent entity to perform the
      applicable responsibilities (as described in Attachment B) concerning the project. The
      PHA must keep the legal opinion in its files for the length of the PBV HAP contract,
      the HCV HAP contract, or Homeownership assistance, as applicable.
(4)   Classifying a PBV project as PHA-owned due to a change in ownership. If an
      ownership structure changes in a manner that would cause a project to become
      classified as PHA-owned (e.g., the PHA ownership interest is increased to an amount
      greater than 50 percent), then the PHA must identify to the local HUD Field Office of
      Public Housing, in writing, within 30 days of the change in ownership, the proposed
      independent entity that will perform the applicable independent entity responsibilities.
      See Attachment B of this notice for more information on independent entities.
(5)   Contract requirements for PHA-owned units. Because the HAP contract administrator
      and the owner cannot be the same legal entity (i.e., the PHA acting as contract
      administrator cannot execute a contract with itself as the owner of the PBV or HCV
      units), the PHA must establish a separate legal entity to serve as the owner. Such entity
      may be one of the following:
      (a)    A non-profit affiliate or instrumentality of the PHA;
      (b)    A limited liability corporation;
      (c)    A limited partnership;
      (d)    A corporation; or
      (e)    Any other legally acceptable entity recognized under State law.
      Such an entity would serve as the owner only for purposes of execution of the HAP
      contract. In cases where the independent entity is required to notify the PHA, the
      notification requirement is satisfied by notifying the PHA itself. The entity that is
      serving as the owner for purposes of contract execution does not need to be notified as
      well.
(6)   Rental Assistance Demonstration (RAD). As it pertains to conversions to the PBV
      program under RAD, the definition of control/ownership provided under the RAD
      notice (PIH–2012–32 (HA) H–2017–03, REV-3 or successor) is used specifically to
      determine whether a PHA retains sufficient control over a project for purposes of
      HUD’s requirement for ownership or control of the Covered Project by a public or
      non-profit entity for RAD conversions.
      For purposes of determining whether the PHA will be required to use an independent
      entity to perform certain functions concerning the project, the provisions of this notice
      apply to RAD PBV conversions. This means that, under certain circumstances (such as
      when the PHA holds only a fee interest as ground lessor in the property in which the
      unit is situated), a project may meet the RAD definition of ownership or control, but
      may not be considered to be PHA-owned under this notice. In such a circumstance, the
      PHA would not be required to use an independent entity.




                                        page 11 of 66
Attachment B: PHA-Owned Units and Independent Entities
Regulation: 24 CFR §983.59, 24 CFR §982.352, and 24 CFR §982.628(d)
HOTMA Reference: Not applicable
Applicable Programs: HCV (including the Homeownership Option) and PBV
Summary of Change: HUD is changing the existing policy for independent entity review and
approval by superseding the requirements established under Section III of Notice PIH 2015–
05. Notice PIH 2015–05 required a PHA to submit documentation that demonstrated or
supported the independent nature of the parties’ relationship. With the publication of this
notice, PHAs must, instead, submit a joint certification as explained in paragraph 3, HUD
independent entity approval, below.
The requirement to submit a joint certification is a change to HUD policy as laid out in the
aforementioned PIH notice; it is not a change resulting from the enactment of HOTMA. HUD
expects that this change will ease PHA administrative burden because PHAs will no longer
need to produce documentation (such as financial statements, legal documents showing the
structure of each organization, etc.) showing the independent nature of the parties. While
HUD retains the right to request more information, HUD expects that this will be unnecessary
in the majority of cases. This attachment also provides some examples of independent entities
and includes tables that provide a visual representation of independent entity functions.
Content: If a unit is considered PHA owned (based on the definition of PHA-owned unit, as
explained in Attachment A of this notice), then Section 8(o)(11) of the Act requires that the
unit of general local government or a HUD-approved independent entity perform certain
functions for such units. If the PHA itself is the unit of general local government or an agency
of such government, then the next level of general local government may perform such
functions without HUD approval. For example, if the PHA itself is the city or an agency of the
city, then the county or state government may perform the functions without HUD approval.
In cases where there is no next level of general local government (e.g., the PHA is an agency
of the state) or the PHA opts not to have independent-entity functions performed by the next
level of general local government, then the PHA must retain the services of an independent,
HUD-approved public or private entity.
For purposes of this attachment, the term “independent entity” refers to either the unit of
general local government or the HUD-approved independent entity, as applicable. The
provisions of this attachment apply to the HCV program (including the Homeownership
Option) and the PBV program, except where otherwise noted.
PHAs are encouraged to maintain all documentation related to independent entity functions
and approvals in the project file for the duration of the HAP contract.
(1)    Relationship between the PHA and the independent entity. As stated in previous HUD
       guidance, the independent entity and PHA must be autonomous. That is, the parties
       must not be connected legally, financially (except with regard to compensation for
       services performed for PHA-owned units), or in any other manner that could cause
       either party to be improperly influenced by the other. For example, the independent
       entity must not include individuals who have a relationship with the PHA or the
       project that would interfere with the entity’s exercise of independent judgment in


                                          page 12 of 66
        carrying out responsibilities as they relate to the PHA-owned units.
        Further, the independent entity must have the ability to perform its responsibilities in
        an unbiased manner, and the PHA must not take any action that could prevent the
        independent entity from making unbiased determinations related to its responsibilities.
        Examples of independent entities include, but are not limited to: PHA vendors, real
        estate agencies, non-profit social services agencies with affordable housing
        experience, and law firms specializing in affordable housing law (for example, to
        perform the review of the PBV selection process).
(2)     Independent entity functions. The independent entity is responsible for performing
        certain functions for PHA-owned units. The table below provides an overview of each
        function to be performed by the independent entity, and its regulatory basis, under the
        PBV program and the HCV program (including the Homeownership Option). Any
        additional information on a particular function is discussed following the overview
        table.

                        Table 1: Overview of Independent Entity Functions

                                                                       Applicable Program:
                             Function
                                                                        Regulatory Basis

 Review the PHA’s PBV selection process.                          PBV: 24 CFR §983.51(e)

 Establish PBV contract rents (initial rent to owner and          PBV: 24 CFR §983.59(b)(1)
 redetermined rent to owner).                                     PBV: 24 CFR §983.301(g)

                                                                  PBV: 24 CFR §983.303(f)(1)
 Determine rent reasonableness.                                   HCV: 24 CFR
                                                                  §982.352(b)(1)(iv)(A)(1)

 Determine reasonableness of the sales price and any PHA-         Homeownership: 24 CFR
 provided financing under the Homeownership Option.               §982.628 (d)(3)(iv)

 Provide a copy of the rent reasonableness determination to the
                                                                  PBV: 24 CFR §983.303(f)(2)
 PHA and the HUD field office where the project is located.

 Notify the PHA and the family of the rent reasonableness         HCV: 24 CFR
 determination.                                                   §982.352(b)(1)(iv)(A)(1)

                                                                  HCV: 24 CFR
 Assist the family in negotiating the rent with the owner.
                                                                  §982.352(b)(1)(iv)(A)(2)

 Establish term of initial and any renewal HAP contract as
                                                                  PBV: 24 CFR §983.59(b)(2)
 required in 24 CFR §983.205.

 Inspect units.                                                   PBV: 24 CFR §983.59(b)(3)



                                             page 13 of 66
                                                                       Applicable Program:
                           Function
                                                                        Regulatory Basis
                                                                  PBV: 24 CFR §983.103(f)(1)
                                                                  HCV: 24 CFR
                                                                  §982.352(b)(1)(iv)(A)(3)
                                                                  Homeownership: 24 CFR
                                                                  §982.628 (d)(3)(i)

Provide a copy of the inspection report to PHA and HUD field      PBV: 24 CFR §983.103(f)(2) and
office where the project is located.                              (3)

Communicate the results of the inspection to the family and the   HCV: 24 CFR
PHA.                                                              §982.352(b)(1)(iv)(A)(3)

Review the inspection report prepared by the independent
                                                                  Homeownership: 24 CFR
inspector designated by the family under the Homeownership
                                                                  §982.628 (d)(3)(ii)
Option.

                                                                  Homeownership: 24 CFR
Review the contract of sale under the Homeownership Option.
                                                                  §982.628 (d)(3)(iii)



      (a)     Review of the PHA’s PBV selection process. As it relates to the PBV selection
              process, the PHA may either choose to use an independent entity or request
              that the local HUD Office of Public Housing perform the review. Non-
              competitive selections must also be reviewed to ensure that the selection was
              done properly. At a minimum, the PHA must submit the following to the HUD
              Field Office or the independent entity, as applicable:
              (i)     All proposals submitted for PBV assistance in connection with the
                      particular selection, including proposals submitted for selection in
                      accordance with 24 CFR §983.51(b)(2);
              (ii)    A copy of the relevant section of the PHA’s Administrative Plan;
              (iii)   A copy of any standard operating procedures, worksheets, checklists, or
                      any other work product used in the selection of PBV proposals; and
              (iv)    If the proposal was selected pursuant to a request for proposals in
                      accordance with 24 CFR §983.51(b)(1), a copy of the solicitation; or
              (v)     If the proposal was selected pursuant to a qualifying previous
                      competition in accordance with 24 CFR §983.51(b)(2), a copy of the
                      proposal for the previous competition, and any award letter provided in
                      connection with the previous competition. If proposals from a previous
                      competition are not retrievable, other documentation that demonstrates
                      that the requirements of 24 CFR §983.51(b)(2) are met (e.g., proposal
                      selected within 3 years of the PBV proposal selection date, proposal


                                          page 14 of 66
             selected in accordance with the applicable program’s competitive
             selection requirements, etc.).
      The HUD Field Office or HUD-approved independent entity may request from
      the PHA additional documentation necessary to complete the review process.
      The PHA’s selection procedures must apply to all PBV proposals and must be
      designed in a manner that does not effectively eliminate the submission of
      proposals for non-PHA-owned units or give undue preferential treatment (e.g.,
      additional points) to PHA-owned units. The HUD Field Office or HUD-
      approved independent entity must provide a letter stating that the PHA-owned
      units were appropriately selected based on the selection procedures specified in
      the PHA’s Administrative Plan before the PHA may finalize the selection
      process.
      Under HOTMA, certain PBV units may be attached to a project without a
      competitive selection process. More information may be found in Attachment
      L of this notice.
      The review of the PHA selection process is waived for RAD PBV conversions.
(b)   PBV rent determinations. The independent entity determines rent (initial rent to
      owner and redetermined rent to owner) for PHA-owned units in accordance
      with the same requirements as for other PBV units. PBV rent determination
      requirements are found at 24 CFR Part 983, Subpart G.
      Rent to owner is redetermined by written notice from the independent entity to
      the PHA specifying the amount of the redetermined rent. The independent
      entity notice of the rent adjustment constitutes an amendment of the rent to
      owner specified in the HAP contract. Such amendments must be documented
      by a signed exhibit to the HAP contract.
      The independent entity redetermines rent for RAD PBV units. That is, the
      independent entity is responsible for conducting the rent reasonableness
      determination and for processing Operating Cost Adjustment Factor (OCAF)
      adjustments for RAD PBV units.
(c)   Term of existing PBV HAP contracts. The term of a HAP contract and any
      HAP contract extension for PHA-owned units must be agreed upon by the
      PHA and the independent entity. HOTMA provides that the initial term of a
      HAP contract may be up to 20 years (increased from 15 years) and that a HAP
      contract may be extended for an additional 20 years (again, increased from 15
      years). See Attachment G of this notice for more information about this
      change.
(d)   Inspection requirements. Independent entities are responsible for conducting all
      required inspections for PHA-owned units in accordance with program
      requirements. The PHA must provide families with up-to-date contact
      information for the independent entity and explain that a family requesting an
      inspection of the unit makes such a request directly to the independent entity.
      See Appendix IV of this notice for more information on HCV,
      Homeownership, and PBV inspection requirements.

                                page 15 of 66
(3)   HUD independent entity approval. This section discusses what information must be
      submitted, when it must be submitted, and other requirements related to the HUD
      independent entity approval process.
      (a)    What information to submit. The PHA must include in its submission to the
             local HUD Office of Public Housing a joint PHA and independent entity
             certification, which certifies that the PHA and the proposed entity have no
             legal, financial, or any other connection that could cause either party to be
             improperly influenced by the other and that the proposed independent entity
             will perform its responsibilities as it relates to the PHA-owned units in an
             unbiased manner. The certification must be dated and signed by the executive
             director, or equivalent position, of the PHA and the independent entity. The
             certification must clearly state the name, address, and point of contact for both
             the PHA and the proposed independent entity.
             The HUD Office of Public Housing retains the discretion to accept the
             certification on its face or to request additional information, or to use
             information available to the HUD Office, to question the validity of the
             certification.
      (b)    When to submit. The PHA must submit the independent entity for approval
             before the function to be performed by the entity takes place. In determining
             when to submit the independent entity for approval, a PHA must consider the
             functions that are required to be performed by the independent entity, whether
             the PHA will use more than one independent entity for different functions, the
             HUD processing time, and how all of these elements interplay with the
             expected action (HCV HAP contract execution, homeownership closing, PBV
             proposal selection, etc.).
      (c)    Using different independent entities. If the PHA plans to use different
             independent entities to perform different functions, or different independent
             entities at different projects, the PHA must submit for approval each
             independent entity it plans to use and identify the function the entity will
             perform. PHAs are not required to submit all independent entities at the same
             time.
      (d)    Previously approved independent entities. Once an independent entity has been
             approved by HUD, the PHA may use that same independent entity for other
             PHA-owned units or for other functions. If the PHA will use an independent
             entity to perform a function other than the function for which the independent
             entity was previously approved, then the PHA must certify in writing to HUD
             that it will use a previously HUD-approved independent entity to perform a
             new function, which must be identified in the certification. The certification
             must include the name of the independent entity and be dated and signed by the
             executive director, or equivalent position, of the PHA. The certification must
             clearly state the name, address, and point of contact for both the PHA and the
             independent entity. The entity must be qualified to perform the function or the
             local HUD Office of Public Housing may deny approval. For example, a law
             firm that was previously approved to review a PBV selection review process


                                        page 16 of 66
             may not be an appropriate independent entity for the purpose of conducting
             inspections.
(4)   Payment for independent entity services. Payment for services performed by the
      independent entity are the responsibility of the PHA (24 CFR 983.59(d)). The PHA
      may compensate the independent entity from PHA ongoing administrative fee income
      (including amounts credited to the administrative fee reserve (i.e., Unrestricted Net
      Position)). The PHA may not use other HUD program receipts to compensate the
      independent entity for its services. MTW agencies may use other sources of funds for
      these purposes provided that such use is consistent with the MTW agency’s HUD-
      approved MTW plan. Neither the PHA nor the independent entity may charge any
      family that occupies or will occupy a PHA-owned unit any fee for the services
      provided by the independent entity.




                                       page 17 of 66
Attachment C: Percentage Limitation (Program Cap) and PHA Submission
Requirements
Regulation: 24 CFR §983.6
HOTMA Reference: Sec. 106(a)(2), which amends Sec. 8(o)(13)(B) of the Act
Applicable Program: PBV
Summary of Change: Under HOTMA, a PHA may project-base up to 20 percent of its
Consolidated Annual Contributions Contract (ACC) authorized units, instead of 20 percent of
its voucher budget authority. HOTMA also establishes a 10 percent exception to this program
cap (discussed in Attachment D), for units that meet the exception criteria. The changes
implemented by the January 18, 2017, implementation notice supersede the reporting
requirements at 24 CFR §983.6 and are explained in detail in paragraph (2), below. This
Attachment C supersedes Notice PIH 2015–05, Section II, in its entirety.
Content: As described below, HOTMA authorizes a PHA to attach PBV assistance to not
more than 20 percent of its ACC authorized units instead of 20 percent of its voucher budget
authority. For purposes of this provision, the term “authorized units” means the number of
units under the PHA’s current ACC. A PHA may confirm this number in the Inventory Detail
feature of the Inventory Management System/PIH Information Center (IMS/PIC). IMS/PIC
may be accessed at the following HUD webpage: Inventory Management System (IMS)/PIH
Information Center (PIC).
HOTMA did not change the requirement that a PHA provide advance notice to its HUD field
office of its intent to project-base vouchers. While a PHA is no longer required to submit
evidence of sufficient budget authority as part of this advance notice, it must still ensure that it
will have budget authority sufficient to cover the PBV HAP contract at the point of contract
execution.
Among other things, this Attachment describes what must be submitted to HUD, when it must
be submitted, how it must be submitted, and how HUD will respond.
(1)    Calculations. Appendix I provides PBV program cap calculation instructions that
       complement a sample PBV Program Cap Calculation Worksheet. The sample
       worksheet is available at the following webpage: PBV Program Cap Calculation
       Worksheet. Use of the sample worksheet is optional, and submission to HUD is not
       required.
(2)    Revised requirements for notification to HUD.
       (a)     What must be submitted. The PHA must submit to the local HUD Office of
               Public Housing all of the following information:
               (i)     The number of units authorized under the ACC for the PHA;
               (ii)    The number of PBV units entirely excluded from the percentage
                       limitation (as described in Attachment F of this notice);
               (iii)   The number of units qualifying under the 10 percent program cap
                       exception category (as described in Attachment D of this notice);
               (iv)    The number of units currently committed to PBV (excluding those PBV


                                            page 18 of 66
              units meeting an exception under Attachment D or F of this notice). To
              arrive at the “number of units committed to PBV,” total the number of
              units that are:
              (I)     Currently under PBV HAP contract;
              (II)    Under an Agreement to Enter into HAP contract (AHAP);
                      and/or
              (III)   Covered by a notice of proposal selection (24 CFR §983.51(d));
                      and
      (v)     The number of units to which the PHA is proposing to attach project-
              based assistance through the new RFP or selection.
(b)   When a PHA must submit information to HUD. The above information must
      be submitted no later than 14 calendar days prior to undertaking any of the
      following actions:
      (i)     Issuing a request for proposals (RFP) (24 CFR §983.51(b)(1));
      (ii)    Selecting a project based on a previous competition (24 CFR
              §983.51(b)(2)); or
      (iii)   If applicable, selecting a project without following a competitive
              process (see Attachment L of this notice).
(c)   How to submit information to HUD. The required information must be
      submitted by email to pbvsubmission@hud.gov.
(d)   HUD response. HUD will respond to the submission by email, identifying
      whether HUD has identified any issues with the submission. For example, if
      there is a material error in the PHA’s calculations that would result in the PHA
      exceeding the 20 percent percentage limitation, HUD will inform the PHA of
      this via email. A PHA must await a response from HUD prior to proceeding
      with the proposal.
      HUD’s review and approval of the submission does not mean that it has
      confirmed availability of the PHA’s budget authority, as this is the
      responsibility of the PHA.




                                 page 19 of 66
Attachment D: PBV Percentage Limitation — 10 Percent Increase for Eligible Units
Regulation: 24 CFR §983.6
HOTMA Reference: Sec. 106(a)(2), which amends Sec. 8(o)(13)(B) of the Act
Applicable Program: PBV
Summary of Change: Under HOTMA a PHA may project-base an additional 10 percent of
its ACC authorized units above the 20 percent program limit, provided the additional units fall
into one of the eligible exception categories.
Content: In this Attachment, the eligible exception categories are explained. The units
eligible for inclusion in this 10 percent exception category may be distributed among one, all,
or a combination of the categories as long as the total number of units does not exceed the 10
percent cap. For example, if 10 percent of ACC authorized units is 100, the PHA may project
base 50 units for homeless families and 50 units for units providing supportive housing to
persons with disabilities or elderly persons.
(1)     Exception Categories.
        (a)     Homeless. The units are specifically made available to house individuals and
                families who meet the definition of homeless under section 103 of the
                McKinney-Vento Homeless Assistance Act (42 U.S.C. 11302) and contained
                in the Continuum of Care Interim Rule at 24 CFR §578.3. The definition of
                homeless is included below for convenience:1
                (i)     An individual or family who lacks a fixed, regular, and adequate
                        nighttime residence, meaning:
                        •        An individual or family with a primary nighttime residence that
                                 is a public or private place not designed for or ordinarily used as
                                 a regular sleeping accommodation for human beings, including
                                 a car, park, abandoned building, bus or train station, airport, or
                                 camping ground;
                        •        An individual or family living in a supervised publicly or
                                 privately operated shelter designated to provide temporary
                                 living arrangements (including congregate shelters, transitional
                                 housing, and hotels and motels paid for by charitable
                                 organizations or by federal, state, or local government programs
                                 for low-income individuals); or
                        •        An individual who is exiting an institution where he or she
                                 resided for 90 days or less and who resided in an emergency
                                 shelter or place not meant for human habitation immediately
                                 before entering that institution;
                (ii)    An individual or family who will imminently lose their primary


1
 See Homeless Emergency Assistance and Rapid Transition to Housing: Continuum of Care Program; Interim
Final Rule.


                                              page 20 of 66
        nighttime residence, provided that:
        •      The primary nighttime residence will be lost within 14 days of
               the date of application for homeless assistance;
        •      No subsequent residence has been identified; and
        •      The individual or family lacks the resources or support
               networks, e.g., family, friends, faith-based or other social
               networks needed to obtain other permanent housing;
(iii)   Unaccompanied youth under 25 years of age, or families with children
        and youth, who do not otherwise qualify as homeless under this
        definition, but who:
        •      Are defined as homeless under section 387 of the Runaway and
               Homeless Youth Act (42 U.S.C. 5732a), section 637 of the
               Head Start Act (42 U.S.C. 9832), section 41403 of the Violence
               Against Women Act of 1994 (42 U.S.C. 1437e-2), section
               330(h) of the Public Health Service Act (42 U.S.C. 254b(h)),
               section 3 of the Food and Nutrition Act of 2008 (7 U.S.C.
               2012), section 17(b) of the Child Nutrition Act of 1966 (42
               U.S.C. 1786(b)), or section 725 of the McKinney-Vento
               Homeless Assistance Act (42 U.S.C. 11434a);
        •      Have not had a lease, ownership interest, or occupancy
               agreement in permanent housing at any time during the 60 days
               immediately preceding the date of application for homeless
               assistance;
        •      Have experienced persistent instability as measured by two
               moves or more during the 60-day period immediately preceding
               the date of applying for homeless assistance; and
        •      Can be expected to continue in such status for an extended
               period of time because of chronic disabilities, chronic physical
               health or mental health conditions, substance addiction, histories
               of domestic violence or childhood abuse (including neglect), the
               presence of a child or youth with a disability, or two or more
               barriers to employment, which include the lack of a high school
               degree or General Education Development (GED), illiteracy,
               low English proficiency, a history of incarceration or detention
               for criminal activity, and a history of unstable employment; or
(iv)    Any individual or family who:
        •      Is fleeing, or is attempting to flee, domestic violence, dating
               violence, sexual assault, stalking, or other dangerous or life-
               threatening conditions that relate to violence against the
               individual or a family member, including a child, that has either
               taken place within the individual's or family's primary nighttime
               residence or has made the individual or family afraid to return to

                           page 21 of 66
                     their primary nighttime residence;
             •       Has no other residence; and
             •       Lacks the resources or support networks, e.g., family, friends,
                     faith-based or other social networks, to obtain other permanent
                     housing.
(b)   Veterans. The units are specifically made available to house families that are
      comprised of or include a veteran. A veteran is an individual who has served in
      the United States armed forces. The PHA may further define “veteran” in its
      Administrative Plan for purposes of determining if the units are eligible for this
      exception. For example, a PHA may choose to include in its definition of
      “veteran” an individual with an “other than dishonorable” discharge status who
      is ineligible for healthcare provided through the Veterans Health
      Administration. PHAs have discretion in establishing verification of eligibility.
      HUD-awarded vouchers specifically designated for project-based assistance
      out of HUD-VASH appropriated funding are already excluded from the
      program cap and are not to be included under this 10 percent exception
      category. See Attachment F of this notice for additional information.
(c)   Supportive services. The units provide supportive housing to persons with
      disabilities or to elderly persons. For the purpose of this exception, supportive
      housing means: A project that makes supportive services available for all of the
      assisted families in the project and provides a range of services tailored to the
      needs of the residents occupying such housing. Such services may include (but
      are not limited to):
      •      meal service adequate to meet nutritional need;
      •      housekeeping aid;
      •      personal assistance;
      •      transportation services;
      •      health-related services;
      •      case management;
      •      child care;
      •      educational and employment services;
      •      job training;
      •      counseling; or
      •      other services designed to help the recipient live in the community as
             independently as possible.
      A PHA must include in its Administrative Plan the types of services offered to
      families for a project to qualify for the exception and the extent to which such
      services will be provided (e.g., length of time services will be provided to a


                                 page 22 of 66
             family, frequency of services, and depth of services). Such supportive services
             need not be provided by the owner or on-site, but must be reasonably available
             to the families receiving PBV assistance in the project. A PHA must not
             require participation in the supportive services as a condition of living in an
             excepted unit.
             In accordance with 24 CFR §983.354, with the exception of an assisted living
             facility, the owner of a PBV project may not require the assisted family to pay
             charges for meals or supportive services, and non-payment of such charges by
             the family is not grounds for termination of tenancy. In the case of an assisted
             living facility (as defined in 24 CFR §983.3) receiving PBV assistance, owners
             may charge families for meals or supportive services. These charges may not
             be included in the rent to owner or the calculation of reasonable rent.
      (d) Poverty rate of 20 percent or less. The units are located in a census tract with a
          poverty rate of 20 percent or less, as determined in the most recent American
          Community Survey 5-Year Estimates. A project that qualifies for the increased
          project cap at the time of HAP contract execution continues to qualify for the
          exception for the length of the contract regardless of changes in the poverty rate
          for the census tract in which the project is located. To view poverty rates by census
          tract, click here.
      The above categories are separate and distinct from exceptions to the income-mixing
      requirement (project cap), which limits the number and percentage of units within a
      particular project to which PBV assistance may be attached. These exceptions are
      discussed in Attachment E of this notice. (Units that are exempt from both the program
      cap and the project cap are discussed in Attachment F.)
(2)   Impact on existing contracts. PBV units that fall into one of the four categories listed
      above may be covered by this 10 percent exception authority only if the units are
      covered under a HAP contract that was first executed on or after April 18, 2017 (the
      effective date of the January 18, 2017, implementation notice).
      Units added on or after April 18, 2017, through an amendment of a HAP contract that
      was first executed prior to April 18, 2017, are not eligible for this 10 percent exception
      authority.
      A PHA need not meet the 20 percent program cap before it can designate eligible units
      for the 10 percent exception category. For example, if a PHA has project-based 10
      percent of its units under the percentage limitation and wants to project-base 5 percent
      of its units under the 10 percent exception category, it may do so. This PHA would
      have 10 percent remaining under the percentage limitation and 5 percent remaining
      under the 10 percent exception authority.
      A PHA proposal that would result in the PHA exceeding either the 20 percent program
      cap or the 10 percent exception from the program cap will be rejected by the HUD
      field office. As long as a PHA has not exceeded the 30 percent limit, it may correct its
      proposal by moving units from one category to the other, as long as only eligible units
      are counted toward the 10 percent exception from the program cap.



                                         page 23 of 66
(3)   Submission requirements. See Appendix I on calculating the number of voucher units
      that may be project-based. If a PHA wishes to add PBV units under this exception
      authority, then the PHA must identify the exception category for which the additional
      units will be project-based and the specific number of units that qualify under the
      exception category in its transmittal of the submission requirements described in
      Attachment C of this notice.




                                       page 24 of 66
Attachment E: Income-Mixing Requirement (Project Cap)
Regulation: 24 CFR §983.56(a), 24 CFR §983.56(b)(1) and (2), 24 CFR §983.261(c) and (d)
HOTMA Reference: Sec. 106(a)(3), which amends Sec. 8(o)(13)(D) of the Act
Applicable Program: PBV
Summary of Change: HOTMA amends the income-mixing requirement for an individual
project (i.e., the project cap) so that the limitation on the number of PBVs in a project is now
the greater of 25 units or 25 percent of the units in a project. Previously, the limitation was 25
percent of the units in a project.
HOTMA also makes changes to the exceptions to the project cap. The following units are
excluded from the 25 percent or 25-unit project cap:
•       Units exclusively serving elderly families.
•       Units housing households eligible for supportive services available to all families
        receiving PBV assistance in the project.
Also, units in projects that are in a census tract with a poverty rate of 20 percent or less are
subject to a higher (40%) cap.
Lastly, HOTMA provides that HUD may establish additional requirements for monitoring and
oversight of projects in which more than 40 percent of the dwelling units are assisted under a
PBV HAP contract.
The previous statutory definition of project for these purposes remains the same. That is, a
project may be a single building, multiple contiguous buildings, or multiple buildings on
contiguous parcels of land. See Appendix II, paragraph (7), of this notice for more
information.
Content:
(1)     Project cap. The limitation on the number of units that may be project-based in an
        individual project is now the greater of 25 units or 25 percent of the units in a project.
        Below is an example to help illustrate this change. This example is meant only to
        illustrate this change, and does not take into account the exceptions discussed later in
        this section.

                                       Project Cap: Example

      Total Units in ABC Project                                                        60

      Post-HOTMA Project Cap (greater of 25 units or 25 percent of units in project)    25

      Pre-HOTMA Project Cap (25 percent of units in project)                            15



        If a project contains 25 or fewer units, the PHA may place every unit in the project
        under the PBV HAP contract.



                                            page 25 of 66
(2)   Exceptions to project cap. An exception to the project cap means that a particular
      category of units is excluded altogether from the 25 percent or 25-unit project cap. As
      of April 18, 2017, the exceptions to the project cap are:
      •      Units exclusively serving elderly families.
      •      Units housing households eligible for one or more supportive services
             available to all families receiving PBV assistance in the project.
      A PHA is not limited with respect to the number of units in a project it can make
      available for an excepted category or categories. A PHA may designate 100 percent of
      the units in a project for occupancy by an excepted category (or categories).
      Prior to HOTMA, dwelling units specifically made available for households comprised
      of elderly families, families with a household member with disabilities, and families
      receiving supportive services were excepted from the project cap. HOTMA retains the
      exception for elderly families. It modifies the exception for families receiving
      supportive services so that such families must simply be “eligible for” supportive
      services (see section (3)(b) of this attachment). HOTMA eliminates the exception for
      families with a household member with disabilities.
      With respect to PBV units that were excepted from the income mixing requirement
      under the pre-HOTMA exception for families with a household member with
      disabilities, the PHA must generally continue to operate under the terms of that
      existing contract. In other words, the pre-HOTMA exception for families with a
      household member with disabilities continues to apply for those units and the PHA
      would refer families with a household member with disabilities to the owner to fill
      vacancies for units covered by this pre-HOTMA exception under the HAP contract.
      See section 6 of this attachment for information on the impact of the HOTMA changes
      on excepted units for existing contracts and how changes can be made to serve
      additional populations.

                              Exceptions to Project Cap: Example

                 ABC Project has a total of 60 units. Twenty of the 60 units are
                 PBV units specifically for elderly families. Units exclusively
                 serving elderly families are excepted from the project cap.
                 The project cap for ABC Project is 25 units (greater of 25 units
                 or 15 units (25 percent of units in project)). A total of 45 units
                 may be project-based in ABC Project (project cap of 25 plus
                 the 20 excepted units).



(3)   Qualifying families. With respect to units excepted from the income mixing
      requirement under the HOTMA exception categories, the PHA may refer only
      qualifying families for occupancy of excepted units under (a) and (b) below.
      (a)    Units for elderly families. Units that are exclusively made available to elderly
             families are excepted from the project cap. The term elderly family is defined
             in 24 CFR §5.403 as follows: “Elderly family means a family whose head

                                           page 26 of 66
      (including co-head), spouse, or sole member is a person who is at least 62
      years of age. It may include two or more persons who are at least 62 years of
      age living together, or one or more persons who are at least 62 years of age
      living with one or more live-in aides.”
      It is not necessary that the entire project or buildings within the project be
      designated as elderly in order for the exception to apply. Under the PBV
      program, projects are not “designated” as elderly as is the case in other
      programs, such as the Public Housing or Section 202 Elderly Programs. The
      owner must identify under the HAP contract, however, the particular number
      of units that are exclusively made available for elderly families. As each unit
      turns over, the PHA may amend the HAP contract to transfer the exception
      status from one unit to another, provided it is possible to substitute a different
      unit for the formerly excepted unit in the project in accordance with 24 CFR
      §983.207(a).
      As provided under 24 CFR §983.262(e), a PHA may allow a family that
      initially qualified for occupancy of an excepted unit based on elderly family
      status to continue to reside in a unit, where through circumstances beyond the
      control of the family (e.g., death or long-term or permanent hospitalization or
      nursing care of the elderly family member), the elderly family member no
      longer resides in the unit. In this case, the unit may continue to count as an
      excepted unit for as long as the family resides in that unit. Once the family
      vacates the unit, in order to continue as an excepted unit under the HAP
      contract, the unit must be made available to and occupied by a qualifying
      family, unless it is possible to transfer the exception status to another unit as
      described in the paragraph above.
(b)   Units for households eligible for supportive services. Under HOTMA, dwelling
      units that are exclusively made available to “households eligible for supportive
      services that are made available to the assisted residents of the project,
      according to the standards for such services the Secretary may establish” are
      excepted from the project cap. Previously, the supportive services exception
      applied only if the family was receiving supportive services.
      In order for the supportive services exception to apply to a unit, the project
      must make supportive services available to all assisted families in the project,
      and the family must be eligible for one or more of the services. The family
      may, but is not required to, participate in the services. A PHA may not require
      participation in supportive services as a condition of living in an excepted unit,
      which means that a PHA may not rely solely on a supportive services program
      that would require the family to engage in the services once enrolled, such as
      the Family Self-Sufficiency (FSS) program, for the unit to qualify for the
      supportive services exception.
      The exception applies to any household eligible for the supportive services and
      is not limited to households with a family member with a disability. The
      supportive services do not need to be provided by the owner or on-site, but the
      services must be reasonably available to the families receiving PBV assistance


                                  page 27 of 66
             in the project and designed to help the families in the project achieve self-
             sufficiency or live in the community as independently as possible.
             A PHA must include in its Administrative Plan the type of services offered to
             families for the units to qualify under the exception and the extent to which
             such services will be provided (e.g., length of time services will be provided to
             a family, frequency of services, and depth of services). A PHA may offer FSS
             as part of the supportive services package, but must not rely solely on FSS to
             meet the exception.
             HUD encourages PHAs to consider how the structure of their supportive
             services package may impact a family’s continued eligibility for the supportive
             services and the unit’s excepted status. The unit loses its excepted status if the
             family becomes ineligible for the supportive services during its tenancy,
             provided that: (i) the family becomes ineligible for all supportive services
             available to the family, and (ii) the family becomes ineligible for reasons other
             than successfully completing the supportive services objective. A family that
             becomes ineligible for the supportive services during its tenancy cannot be
             terminated from the program or evicted from the unit. If the unit loses its
             excepted status, and the PHA does not want to reduce the number of excepted
             units in its project-based portfolio, the PHA may:
             (i)     Substitute the excepted unit for a non-excepted unit if it is possible to
                     do so in accordance with 24 CFR §983.207(a). A PHA may wish to
                     consider whether adding units to the HAP contract is an appropriate
                     strategy to allow for the substitution of units. For example, Bay View
                     Project has a total of 100 units. 50 of those units are under a PBV HAP
                     contract and are all excepted units. In this case, the PHA may add non-
                     excepted units to the contract (provided it is possible to do so under
                     PBV requirements) to allow for the substitution of the excepted unit for
                     the non-excepted unit. See section 6 of this attachment for more
                     information on adding units to existing HAP contracts.
             (ii)    Remove the unit from the PBV HAP contract, and provide the family
                     with tenant-based assistance. Once the family has moved from the unit,
                     add the unit back to the contract in accordance with 24 CFR
                     §983.207(b), as amended by HOTMA. Any family newly admitted to
                     the unit must be eligible for supportive services in order for the unit to
                     retain its excepted status.
             In the case of a family that chooses to participate in the supportive services, as
             described by the PHA in the Administrative Plan, and successfully completes
             the supportive services objective, as defined by the PHA in its Administrative
             Plan, the unit will continue to be an excepted unit under this category for as
             long as the family resides in the unit.
(4)   Other units not subject to the percentage limitation and project cap. The details and
      requirements of this exception category are described in Attachment F of this notice.




                                        page 28 of 66
(5)   Increased project cap. Up to the greater of 25 units or 40 percent (instead of the greater
      of 25 units or 25 percent) of the units in a project may be project-based when the
      project is located in a census tract with a poverty rate of 20 percent or less, as
      determined in the most recent American Community Survey 5-Year Estimates. A
      project that qualifies for the increased project cap at the time of HAP contract
      execution continues to qualify for the exception for the length of the contract
      regardless of changes in the poverty rate for the census tract in which the project is
      located. To view poverty rates by census tract, click here.
      HOTMA also provides that the 40 percent unit exception applies to projects in areas
      where vouchers are difficult to use, as determined by HUD. HUD has not yet defined
      and implemented the exception authority for these “difficult to use” areas. Therefore,
      the 40 percent exception applies only to census tracts with poverty rates of 20 percent
      or less until further notice.

                                Increased Project Cap: Example

                 ABC Project has a total of 80 units. ABC Project is located in a
                 census tract with a poverty rate of 20 percent or less. The
                 project cap for ABC Project is 32 units (greater of 25 units or
                 32 units (40 percent of units in project)).



(6)   Effect on existing contracts. Owners under HAP contracts in effect prior to April 18,
      2017, the effective date of the January 18, 2017, implementation notice, remain
      obligated by the terms of those HAP contracts with respect to the requirements that
      apply to the number and type of excepted units in a project. That is, the owner must
      continue to designate the same number of contract units and assist the same number
      and type of excepted units as provided under the HAP contract during the remaining
      term of the HAP contract, unless the owner and the PHA mutually agree to change
      those requirements.

                             Effect on Existing Contracts: Example

                 An owner has a PBV HAP contract for a 20-unit project, and
                 the HAP contract provides that 15 of those units were
                 excepted from the 25 percent income-mixing requirement,
                 because the units are designated for elderly families. The
                 owner must continue to designate those units for occupancy
                 by elderly families, notwithstanding the fact that the
                 statutory limit on PBV has been increased to 25 units, unless
                 the owner and the PHA mutually agree to change the terms
                 of the assistance contract.



      The PHA and owner may agree to change such HAP contract requirements as it
      pertains to the exception categories of elderly families and families eligible for


                                           page 29 of 66
      supportive services. The PHA and owner must not change the terms of an existing
      HAP contract to add a new category of excepted unit (such as those under a rent
      restriction as defined in Attachment F of this notice), because those provisions may
      only be applied to contracts that become effective on or after April 18, 2017, the
      effective date of the January 18, 2017, implementation notice.
      For projects that are using the former supportive services statutory exemption (which
      required that the family be receiving the supportive services) and /or the exemption for
      families with a household member with disabilities, the PHA and the owner will
      continue to operate under the pre-HOTMA requirements and will continue to renew
      their HAP contracts under the old requirements, unless the PHA and the owner agree
      by mutual consent to change the conditions to conform with the HOTMA requirement.
      The PBV HAP contract may not be changed to conform with the HOTMA
      requirement if the change would jeopardize an assisted family’s eligibility for
      continued assistance at the project (e.g., the excepted units at the project include units
      designated for families with a household member with disabilities, and changing to the
      HOTMA standard would result in those units no longer being eligible as excepted
      units unless the owner makes supportive services available to all assisted families in
      the project).
      A HAP contract may be amended, at the discretion of the PHA, to add additional PBV
      units in the same project. PHAs may use this amendment process to add units where
      applying the new project cap definition results in more PBV units. For example, ABC
      Project has a total of 60 units. The pre-HOTMA project cap was 15 units. The post-
      HOTMA project cap is 25 (greater of 25 units or 15 units (25 percent of units in
      project)). The existing PBV HAP contract had no excepted units. The PHA, at its
      discretion, may amend the HAP contract to add the 10 additional units that result from
      the HOTMA project cap definitional change.
      As it pertains to the amendment process to add new units to an existing HAP contract,
      HOTMA overrides existing regulation, so that new units may be added at any time
      during the term of the HAP contract without being subject to competitive selection
      procedures. See Attachment J for more information about this change. All other
      requirements of 24 CFR §983.207(b) must be met, including not exceeding the 20
      percent program cap (see Attachment C of this notice for more information on the 20
      percent program cap).
(7)   No HUD notification requirement. Unlike the program cap, there is no requirement to
      submit PBV project cap information to HUD.




                                         page 30 of 66
Attachment F: Units Not Subject to Percentage Limitation (Program Cap) or Income-
Mixing Requirement (Project Cap)
Regulation: 24 CFR §983.6, 24 CFR §983.56(a), 24 CFR §983.56(b)(1) and (2)
HOTMA Reference: Sec. 106(a)(2), which amends Sec. 8(o)(13)(B) of the Act, and Sec.
106(a)(3), which amends Sec. 8(o)(13)(D) of the Act
Applicable Program: PBV
Summary of Change: HOTMA provides that certain units do not count toward the PBV
percentage limitation and are exempt from the income-mixing requirement when PBV
assistance is attached to them.
Content: The following categories of units are excluded from both the percentage limitation
and the income-mixing requirement if placed under HAP contract on or after April 18, 2017:
(1)    Excepted units. Units that were previously subject to certain federal rent restrictions or
       receiving another type of long-term housing subsidy provided by HUD do not count
       toward the percentage limitation or the income-mixing requirement.
       The following categories of units in (a) or (b) are eligible for this exception provided
       they also meet the conditions described in (c) below:
       (a)    The unit received one of the following forms of HUD assistance:
              (i)     Public Housing Capital or Operating Funds (section 9 of the Act);
              (ii)    Project-Based Rental Assistance (section 8 of the Act), including units
                      assisted under the section 8 moderate rehabilitation (Mod. Rehab.)
                      program and Mod. Rehab. single-room occupancy (SRO) program;
              (iii)   Housing for the Elderly (section 202 of the Housing Act of 1959);
              (iv)    Housing for Persons with Disabilities (section 811 of the Cranston-
                      Gonzalez National Affordable Housing Act);
              (v)     The Rent Supplement (Rent Supp) program (section 101 of the Housing
                      and Urban Development Act of 1965);
              (vi)    Rental Assistance Program (RAP) (section 236(f)(2) of the National
                      Housing Act); or
              (vii)   Flexible Subsidy Program (section 201 of the Housing and Community
                      Development Amendments of 1978).
              or
       (b)    The unit was subject to a rent restriction as a result of one of the following
              HUD loan or insurance programs:
              (i)     Section 236;
              (ii)    Section 221(d)(3) or (d)(4) BMIR;
              (iii)   Housing For the Elderly (section 202 of the Housing Act of 1959);
              (iv)    Housing for Persons With Disabilities (section 811 of the Cranston-


                                          page 31 of 66
             Gonzalez National Affordable Housing Act); or
      (v)    Flexible Subsidy Program (section 201 of the Housing and Community
             Development Amendments of 1978).
      Units that were previously receiving PBV assistance or HCV tenant-based
      assistance are not covered by this exception.
(c)   In addition to having received HUD assistance or having been subject to rent
      restrictions as described in parts (a) and (b) above, the unit must meet the
      following applicable conditions to qualify for this exception:
      (i)    PBV Existing and Rehabilitated Units.
             For units that will be placed under PBV as existing or rehabilitated
             units:
             (I)    The unit must be covered under a PBV HAP contract that first
                    became effective on or after April 18, 2017; and
             (II)   In the 5 years prior to the date the PHA either (aa) issued the
                    RFP under which the project was selected, or (bb) selected the
                    project based on a prior competition or without competition, the
                    unit met at least one form of assistance or was subject to a rent
                    restriction as described above. If the existing/rehabilitated
                    project was selected based on a prior competition or without
                    competition, then the date of selection used to determine if the
                    5-year threshold has been met is the date of the PHA written
                    notice of owner selection under 24 CFR §983.51(d).
      (ii)   PBV New Construction.
             A newly constructed unit developed under the PBV program may also
             be excluded from the limitation, provided the unit qualifies as a
             replacement unit. The unit must meet all of the following requirements
             to meet this exception to the limitation:
             (I)    The unit that the PBV newly constructed unit is replacing (i.e.,
                    the original unit) must have received one of the forms of HUD
                    assistance or must have been subject to a rent restriction as a
                    result of one of the HUD loan or insurance programs listed
                    above no more than 5 years from the date the PHA either:
                    (aa)    Issued the RFP under which the PBV new construction
                            project was selected; or
                    (bb)    Selected the PBV new construction project based on a
                            prior competition or without competition. If the PBV
                            new construction project was selected based on a prior
                            competition or without competition, then the date of
                            selection used to determine if the 5-year threshold has
                            been met is the date of the PHA written notice of owner
                            selection under 24 CFR §983.51(d).


                                page 32 of 66
                     (II)    The newly constructed unit is located on the same site as the
                             unit it is replacing. An expansion of or modification to the prior
                             project’s site boundaries as a result of the design of the newly
                             constructed project qualifies as the same site as long as a
                             majority of the replacement units is built back on the site of the
                             original development, and any units that are not built on the
                             existing site share a common border with, are across a public
                             right of way from, or touch that site.
                     (III)   One of the primary purposes of the planned development of the
                             PBV new construction project is or was to replace the
                             affordable rental units that previously existed at the site, as
                             evidenced by at least one of the following:
                             (aa)   Former residents of the original project are provided
                                    with a selection preference that provides the residents
                                    with the right of first occupancy at the PBV new
                                    construction project; or
                             (bb)   Prior to the demolition of the original project, the PBV
                                    new construction project was specifically identified as
                                    replacement housing for that original project as part of a
                                    documented plan for the redevelopment of the site.
                      (IV)    The HAP contract first became effective on or after April 18,
                              2017.
(2)   Unit-size configuration, number of units. The unit-size configuration of a PBV new
      construction or rehabilitation project may differ from the unit-size configuration of the
      original project that the PBV units are replacing. In addition, the total number of PBV
      assisted units may differ from the number of units in the original project. However,
      under no circumstances may the percentage limitation exception be applied to units
      that exceed the total number of covered units in the original project. For example, a
      PBV new construction project will consist of a total of 50 PBV units and is replacing a
      former section 236 project consisting of 40 units. The maximum number of PBV units
      that would meet the program and project limitation exception would be 40 units. The
      remaining 10 PBV units would count against the program and the project limitation.
(3)   Applicability of PBV project-selection requirements. For owner proposals involving
      excepted units for existing, rehabilitated, and newly constructed properties, the
      standard requirements for selecting projects and the units for PBV assistance —
      including consistency with the PHA Plan, the goals of deconcentrating poverty and
      expanding housing and economic opportunities, site selection, and all civil rights
      requirements — remain in effect. The only difference is that any PBV assistance
      provided to these properties does not count against the 20 percent program cap and
      may be used to project-base up to 100 percent of the units in the project. The
      provisions of Notice PIH 2013–27 that concern the voluntary relinquishment by
      families of enhanced voucher assistance for PBV assistance remain in effect. This
      means that, in the event of a Housing Conversion Action at a project, HCV assistance
      may be project-based at the project, but only if the requirements of Notice PIH 2013–

                                         page 33 of 66
      27 are met. Units at the project for which a family has voluntarily relinquished
      enhanced voucher assistance for PBV assistance do not count against a PHA’s
      program cap, nor the income-mixing requirement.
      These exceptions may be applied only to projects that were not already under HAP
      contract as of April 18, 2017 (the effective date of the January 18, 2017,
      implementation notice). The exception may not be applied retroactively to projects
      under HAP contracts that commenced before April 18, 2017, or subsequently applied
      at the extension of those HAP contracts.
(4)   Other units not subject to the percentage limitation or income-mixing requirement.
      (a)    RAD. HUD has waived the statutory and regulatory provisions regarding the
             20 percent percentage limitation for RAD PBV units. Under HOTMA, neither
             are such units subject to the income-mixing requirement, as long as they meet
             the conditions in section (1) of this attachment. This means that a PHA that is
             administering RAD PBV assistance does not take the voucher units attributable
             to the RAD PBV contracts into consideration when calculating the 20 percent
             limitation. In other words, the units committed to RAD PBV are excluded from
             both the numerator and the denominator when calculating the number of
             voucher units that may be project-based. This exception applies regardless of
             the effective date of the HAP contract.
      (b)    HUD-VASH. HUD has awarded vouchers specifically designated for project-
             based assistance out of the HUD-VASH appropriated funding made available
             from the FY 2016, FY 2015, FY 2014, FY 2013, FY 2011, and FY 2010
             Appropriations Acts. Since these PBV HUD-VASH set-aside voucher
             allocations were made specifically for PBV assistance, HUD has determined
             that the PBV units supported by those vouchers will not count against the
             PHA’s PBV program cap, for as long as the vouchers remain under PBV HAP
             contract at the designated project.. This means that a PHA will exclude these
             PBV HUD-VASH units from both the numerator and the denominator when
             calculating the number of authorized ACC units that are available for project-
             basing.
             All other HUD-VASH vouchers, including non–set aside HUD-VASH
             vouchers that a PHA chooses to project-base, are subject to the percentage
             limitation.
             Calculations. See Appendix I for instructions on how to calculate the number
             of voucher units that may be project-based when certain units no longer count
             toward the percentage limitation.
(5)   Reporting requirement. If a PHA wishes to add PBV units under the program cap
      exceptions described above, then the PHA must provide the number of PBV units to
      which it will be attaching PBV assistance under this exception authority to HUD no
      later than 14 calendar days prior to the date that the PHA intends to issue the RFP or
      make the selection. The PHA must indicate the specific exception that covers the units.
      This information must be submitted by email to pbvsubmission@hud.gov.
      A PHA is not required to report future RAD projects for which it will be attaching


                                        page 34 of 66
PBV assistance, or future HUD-VASH awarded vouchers specifically designated by
HUD for project-based assistance. Unlike the program cap, there is no requirement to
submit PBV project cap information to HUD.




                                 page 35 of 66
Attachment G: PBV HAP Contract: Initial Term and Extensions
Regulation: 24 CFR §983.205
HOTMA Reference: Sec. 106(a)(4) & (5), which amend Secs. 8(o)(13)(F) & (G) of the Act
Applicable Program: PBV
Summary of Change: HOTMA amends Sec. 8(o)(13)(F) of the Act to provide that the initial
term of a Housing Assistance Payments (HAP) contract may be up to 20 years (increased
from 15 years) and Sec. 8(o)(13)(G) to provide that a contract may be extended for an
additional 20 years (again, increased from 15 years).
Content: This section overrides 24 §CFR 983.205(a) and (b) only with respect to the length
of the initial term and the extension of the term of the HAP contract. Otherwise, all of the
other requirements of those regulations remain in effect, including the requirement on the
timing of extensions following the initial extension of the contract term. (The timing of when
extensions of the term may be approved is described in detail below.)
(1)    Initial term. As of April 18, 2017, a PHA may enter into a new PBV HAP contract
       with an owner with an initial term of up to 20 years. As was the case previously, the
       length of the initial term of the HAP contract may not be less than one year.
(2)    Maximizing the initial term. For any PBV HAP contract that is still within the initial
       term, the PHA and the owner may mutually agree to extend the contract for up to the
       maximum initial term of 20 years.
       For example, if the HAP contract has an initial term of 15 years with an effective date
       of January 1, 2015, the initial term of the contract ends on December 31, 2029. At any
       time before the end of the initial term, the PHA and owner may mutually agree to
       extend the initial term for an additional 5 years to reach the 20 year maximum initial
       term. For instance, in this example the PHA and owner may extend the initial term to
       December 31, 2034, provided they do so no later than December 31, 2029.
       However, if the HAP contract is no longer in the initial term, the PHA and owner
       cannot extend the initial term, although they may enter into an extension beyond the
       initial term (see below).
       Assume the PHA and owner entered into a HAP contract with a 10 year initial contract
       term on January 1, 2000. The initial term ended on December 31, 2009. During the
       initial term, the PHA and owner extended the contract term for 10 additional years. As
       a result, the HAP contract remains in effect until December 31, 2019. In this case, the
       PHA and owner are not able to extend the initial term of this HAP contract to 20 years
       because the contract already is beyond the initial term. (However, the PHA and owner
       may mutually agree to further extend the current 10 year extension as discussed
       below.)
(3)    Extension of the term. The PHA may extend the term of the contract for up to 20 years
       at any time during the initial HAP contract term, provided the PHA determines an
       extension is appropriate to continue providing affordable housing for low-income
       families.
       The PHA may extend the term multiple times at any time during the term of the


                                         page 36 of 66
      contract, provided that extension beyond the initial term does not exceed 20 years,
      cumulatively. (See examples below.)
(4)   Subsequent extensions beyond 20 years. A PHA may further extend the HAP contract
      beyond 20 years from the end of the initial term as long as the following conditions are
      met:
      (a)     The PHA must determine such extension is appropriate to continue providing
              affordable housing for low-income families or to expand housing
              opportunities;
      (b)     This determination must be made no earlier than 24 months prior to the
              expiration of the HAP contract.
      (c)     The term of the new extension may not exceed 20 years.
      Regardless of the length of the extension, all such extensions must meet these same
      conditions.
(5)   PHA owned units. In the case of PHA-owned units, any changes to the term of an
      initial HAP contract or any contract extension must be agreed upon by the PHA and
      the independent entity, in accordance with 24 CFR §983.59.
(6)   Initial Term and Extension Examples. The following examples are intended to
      illustrate a number of common scenarios regarding HAP contract initial terms and
      extensions.

                                         Scenario 1
      The PHA and owner wish to enter into a new PBV HAP contract effective January 1,
      2018, for the maximum time period that is permitted under the PBV program. The
      maximum contract term that the PHA may commit is 40 years.

       Contract         Term       Start Date     End Date    Notes

       Initial Term     20 yrs     1/1/18         12/31/37    Maximum 20 year term.

       Extension        20 yrs     1/1/38         12/31/57    PHA may extend at any time
                                                              before 12/31/37.

       Total Term       40 yrs     1/1/18         12/31/57    Any further extension may not
                                                              be determined prior to 12/31/55
                                                              (24 months prior to expiration
                                                              date of the 20-year extension.)




                                        page 37 of 66
                                  Scenario 2
HAP contract is currently in effect with the following term:

 Current Term      Term      Start Date    End Date    Comments

 Initial Term      15 yrs    1/1/16        12/31/30    PHA and owner entered into a 15
                                                       year initial term, which was the
                                                       maximum initial term at the time.

 Extension         15 yrs    1/1/31        12/31/45    PHA and owner have previously
                                                       agreed to 15 year extension.

 Total Term        30 yrs    1/1/16        12/31/45    Contract is at pre-HOTMA
                                                       maximum term of 30 years.


Following the implementation of the HOTMA provision, for example in July 2017, the
PHA and owner mutually agreed to extend this contract’s initial term and the
extension to the maximum term that is permitted under HOTMA.

 Revised Term      Term      Start Date    End Date    Comments

 Initial Term      20 yrs    1/1/16        12/31/35    Because the HAP contract is still
                                                       in the initial term, the initial term
                                                       may be adjusted. It is now the
                                                       maximum 20 years.

 Extension         20 yrs    1/1/36        12/31/55    PHA and owner also revised the
                                                       length of the existing extension to
                                                       the 20 year maximum.

 Total Term        40 yrs    1/1/16        12/31/55    Contract is at post-HOTMA
                                                       maximum term of 40 years. PHA
                                                       may consider further extension
                                                       but not until 12/31/53.


                                  Scenario 3
The HAP contract has the following terms.

 Current Term      Term      Start Date    End Date    Comments

 Initial Term      10 yrs    1/1/05        12/31/14    Initial term is over.

 Extension         15 yrs    1/1/15        12/31/29    PHA and owner have previously
                                                       agreed to 15 year extension.

 Total Term        25 yrs    1/1/05        12/31/29    Contract is currently for 25 years.


Following the implementation of the HOTMA provision, the PHA decides it wants to
extend the contract so that the term is 40 years. However, the PHA cannot extend the
initial term since it has already been completed. The PHA is also limited to extending

                                  page 38 of 66
the contract beyond the initial term to no more than 20 years at the present time. The
maximum term the PHA could provide at this time is 30 years, with the understanding
that the PHA will consider further extending the contract when the contract is within
24 months of the revised expiration date.

 Revised Term     Term       Start Date   End Date   Comments

 Initial Term     10 yrs     1/1/05       12/31/14   No change – the initial term is
                                                     already over and may not be
                                                     extended.

 Extension        20 yrs     1/1/15       12/31/34   After April 18, 2017, the PHA and
                                                     owner have now increased the
                                                     extension from 15 years to the
                                                     maximum of 20 years beyond the
                                                     end of the initial term.

 Total Term       30 yrs     1/1/05       12/31/34   Contract has maximum term of 30
                                                     years.

 Future           May not    1/1/35       TBD        PHA may consider further
 Extension        exceed                             extension no earlier than 12/31/32
                  20 years                           (24 month requirement).


                                  Scenario 4
The PHA enters into a new HAP contract effective 1/1/18 for the maximum 20 year
initial term. The PHA wishes to extend the contract but for no more than 10 years at a
time.

 Contract Term     Term      Start Date   End Date   Comments

 Initial Term      20 yrs    1/1/18       12/31/37

 Potential         10 yrs    1/1/38       12/31/47   PHA may approve this first
 Extension #1                                        extension anytime before the initial
                                                     term expires on 12/31/37.

 Potential         10 yrs    1/1/48       12/31/57   PHA may approve this second
 Extension #2                                        extension anytime before the first
                                                     extension expires on 12/31/47.

 Potential         10 yrs    1/1/58       12/31/67   PHA may not make the
 Extension #3                                        determination to approve this
                                                     extension earlier than 12/31/55 (24
                                                     months prior to the expiration of
                                                     the previous extension), because
                                                     any further extension will exceed
                                                     the 20-year limit from the end of
                                                     initial term.




                                  page 39 of 66
 Contract Term     Term      Start Date   End Date   Comments

 Potential         10 yrs    1/1/68       12/31/77   PHA may not make the
 Extension #4                                        determination to approve this
                                                     future extension earlier than
                                                     12/31/65 (24 months prior to the
                                                     expiration of the previous
                                                     extension), because the contract is
                                                     now more than 20 years beyond
                                                     the end of the initial term.


Once the extension beyond the initial term has reached 20 years, cumulatively, the
PHA may not further extend the contract without first determining such extension is
appropriate to continue providing affordable housing for low-income families or to
expand housing opportunities, and the PHA may not make that determination more
than 24 months prior to the expiration of the previous extension. In this example, the
PHA must fulfill that requirement starting with the 3rd potential extension, since the
combination of the first and second extensions (each for 10 years) have reached the 20
year maximum.




                                  page 40 of 66
Attachment H: Priority of PBV HAP Contracts
Regulation: 24 CFR §983
HOTMA Reference: Sec. 106(a)(4), which provides for a new Sec. 8(o)(13)(F)(i)(I) of the
Act
Applicable Program: PBV
Summary of Change: HOTMA establishes a new Sec. 8(o)(13)(F)(i)(I), which requires that,
in the event appropriated funds are insufficient to fund all vouchers administered by a PHA,
the PHA must implement cost-savings measures before terminating any PBV HAP contract.
Content: Cost-saving measures that must be taken prior to terminating assistance contracts
are found in Notice PIH 2011–28 (“Cost-Saving Measures in the Housing Choice Voucher
(HCV) Program”) or subsequent notices. If a PHA implements all of these cost-saving
measures and still has insufficient funds to cover its housing assistance payments, then the
PHA may choose to terminate payments under its HCV or PBV programs.
A PHA may identify in its Administrative Plan any additional cost-saving measures that it
will implement prior to terminating HCV or PBV assistance.
A PHA may determine which type of assistance (HCV or PBV) to terminate first and must
identify in its Administrative Plan the factors it considered in making this determination.




                                         page 41 of 66
Attachment I: PBV Biennial Inspections
Regulation: 24 CFR §983.103
HOTMA Reference: Sec. 106(a)(4), which amends Sec. 8(o)(13)(F) of the Act
Applicable Program: PBV
Summary of Change: HOTMA modifies the statutory language regarding the inspection of
PBV-assisted units to clarify that biennial inspections of PBV-assisted properties may be
conducted using a sample of units. There is no change to the regulatory requirements at 24
CFR §983.103.
Content: The HOTMA change merely clarifies that the use of sampling is authorized for
PBV-assisted units; it does not affect the guidance in Notice PIH 2016–05 (“Streamlining
Administrative Regulations for Programs Administered by Public Housing Agencies”), which
remains in effect. Additionally, HOTMA does not change 24 CFR §983.103(d), governing
biennial inspections. Attachment K to Notice PIH 2016–05 provides guidance to PHAs that
wish to adopt alternative inspection methods.




                                        page 42 of 66
Attachment J: Adding Units to PBV HAP Contract Without Competition
Regulation: 24 CFR §983.207(b)
HOTMA Reference: Sec. 106(a)(4), which provides for a new Sec. 8(o)(13)(F)(ii) of the Act
Applicable Program: PBV
Summary of Change: Prior to HOTMA, the regulation at §983.207(b) stipulated that a HAP
contract could be amended to add units only during the 3-year period following the HAP
execution date, and that, within this timeframe, a new PBV Request for Proposals would not
be required. HOTMA overrides the regulation, stating that new units may be added at any
time during the term of the HAP contract without being subject to competitive selection
procedures.
Content: As of April 18, 2017, any existing PBV HAP contract, including a contract entered
into prior to April 18, 2017, may be amended to add units by mutual agreement of the PHA
and owner without competitive selection. The amendment is subject to all PBV requirements,
including those requirements described below.
(1)    Percentage limitation. The amendment must comply with Sec. 8(o)(13)(B) and 24
       CFR §983.6, which require that a PHA may project-base not more than 20 percent of
       its authorized units, with some types of units excepted from this program cap.
       HOTMA changed how this percentage limitation is to be calculated. See Attachment C
       and Appendix I of this notice for instructions on how to make the calculation and
       report the results to HUD, both of which must be done prior to amending a contract to
       add units.
(2)    Income-mixing requirement (project cap). The amendment must comply with Sec.
       8(o)(13)(D) and 24 CFR §983.56, which limit the number or percentage of units in any
       one project to which PBV assistance may be attached, with exceptions for certain
       types of units. HOTMA made changes to the income-mixing requirement. See
       Attachment E of this notice for further information on the PBV income-mixing
       requirement. Any units added on or after April 18, 2017, must fall under one of the
       HOTMA exception categories in order for the unit to be excepted from the income-
       mixing requirement.
(3)    Rent reasonableness. The rents for the units added to the contract via amendment must
       comply with Sec. 8(o)(10)(A) and §983.303, which require that rents be reasonable. If
       the units newly added to the contract have rents that do not exceed the rents charged
       for units under the original contract or for comparable unassisted units in the project,
       then the rents for the newly added units will be considered to be reasonable.
(4)    Administrative Plan. Whether to add units to a contract is an option that is available at
       the discretion of a PHA. A PHA that intends to add PBV units in this manner must
       state in its Administrative Plan that it will do so and must provide its rationale for
       adding PBV units to specific projects.
(5)    Amendment of RAD PBV HAP contract. A PHA may not amend a RAD PBV HAP
       contract to add units above the number included in the initial contract.
A PHA may amend its PBV HAP contract to add units without competitive selection during
the term of an initial HAP contract or during the term of any extension of that contract. The

                                          page 43 of 66
amendment may also occur at the point of initial contract extension or at the point of any
subsequent extension, so that the contract extension will have a greater number of units than
the previous contract. However, the anniversary and expiration dates of the HAP contract for
the additional units must be the same as the anniversary and expiration dates of the HAP
contract term for the PBV units originally in place under the HAP contract.
24 CFR §983.58(c) does not apply when PBV units are added to a current PBV HAP contract.
In other words, an environmental review is not required, and there is therefore no need for any
sort of determination by a responsible entity.




                                         page 44 of 66
Attachment K: PBV Contract Termination or Expiration without Extension
Regulation: 24 CFR §983
HOTMA Reference: Sec. 106(a)(4), which provides for a new Sec. 8(o)(13)(F)(iv) of the Act
Applicable Program: PBV
Summary of Change: With respect to a PBV HAP contract, HOTMA requires the contract to
specify that, upon termination or expiration of the contract without extension, an assisted
family may elect to remain in its unit and use the assistance previously provided under the
contract, as long as the unit meets HUD’s housing quality standards and the rent for the unit is
reasonable. In such a circumstance, the family may choose to move or to remain in the unit. If
the family remains, it will pay its required share of the rent in addition to the amount, if any,
by which the gross rent exceeds the applicable payment standard. HOTMA also authorizes
HUD to establish additional contract conditions.
Content: This provision applies to all PBV HAP contracts in effect as of April 18, 2017, and
all contracts entered into on or after April 18, 2017. HOTMA establishes for PBV-assisted
families a right to remain in the project at the end of the PBV HAP contract with tenant-based
assistance for as long as the project is used for rental housing and the unit is otherwise eligible
for HCV assistance.
(1)    Owner notification. For any contract entered into prior to April 18, 2017, that remains
       in effect on that date, a PHA must notify the owner in writing that this provision is in
       effect. The notice must contain the following language:
               “Pursuant to Section 106(a)(4) of the Housing Opportunity Through
               Modernization Act of 2016 and Paragraph 26.b. of Part 2 of the PBV HAP
               Contract for Existing Housing or Paragraph 27.b. of Part 2 of the PBV HAP
               Contract for New Construction or Rehabilitation, such contract is amended to
               provide that, upon termination or expiration of the contract without extension,
               each family assisted under the contract may elect to use its assistance to remain
               in the same project if the family’s unit complies with the inspection
               requirements under section 8(o)(8) (42 U.S.C. 1437f(o)(8)) of the U.S.
               Housing Act of 1937 (“the 1937 Act”), the rent for the unit is reasonable as
               required by section 8(o)(10)(A) of the 1937 Act, and the family pays its
               required share of the rent and the amount, if any, by which the unit rent
               (including the amount allowed for tenant-based utilities) exceeds the applicable
               payment standard.”
       Any contract entered into on or after April 18, 2017, must include this language.
(2)    Statutory notice. Per the statutory notice requirements at Sec. 8(c)(8) and 24 CFR
       §983.206, not less than 1 year prior to the termination or expiration without extension
       of a HAP contract, an owner must provide notice to both the PHA and affected
       tenants. An owner who fails to provide such notice must permit tenants to remain in
       their units for the required notice period with no increase in the tenant portion of the
       rent. During this time period, an owner may not evict a tenant as a result of the
       owner’s inability to collect an increased tenant portion of rent. With PHA agreement,
       an owner may renew the terminating contract for a period of time sufficient to give
       tenants 1 year’s advance notice. For families who wish to remain at the property, the

                                           page 45 of 66
      HCV assistance does not commence until the end of the owner’s required notice
      period.
(3)   Housing quality standards. In order for the family to remain at the project with tenant-
      based HCV assistance, the unit must meet the HQS requirements of the HCV tenant-
      based program, including initial inspection requirements. HOTMA made a number of
      changes related to the initial inspection requirements. (See Notice PIH 2017–20,
      issued October 27, 2017.)
(4)   Effective date of HCV HAP and family leases. The transition from PBV HAP units to
      HCV HAP units will require the PHA and owner to plan to assure continued payments
      for families under lease and continued payments to the owner of units under HAP. The
      following requirements apply:
      (1)    A PHA may execute an HCV HAP contract before the PBV HAP contract
             terminates, but the HCV HAP contract may not be effective prior to the PBV
             contract termination or expiration date.
      (2)    A PHA may not commence the tenant-based HCV housing assistance payment
             to an owner until the HCV tenant-based HAP contract has been executed.
      (3)    The HCV HAP contract may not be executed before the PHA approves the
             assisted tenancy in accordance with 982.305. An HCV HAP contract for a
             family must be executed no later than 60 calendar days from the start of the
             family’s lease. PHAs are encouraged to approve the assisted tenancy and
             execute the HCV HAP contract without need for the 60-day grace period. If
             this is not possible, then, as long as the HCV HAP contract is executed during
             the 60-day grace period, once it has been executed, the PHA may pay the
             owner retroactively to the start date of the family’s lease term.
      (4)    If the HCV HAP contract has a different rent than did the PBV HAP contract,
             and the new rent is determined by the PHA to be reasonable, then the PHA will
             use the new gross rent to calculate the family’s HCV HAP going forward. The
             family will be responsible for paying the new family rent to owner starting
             from the effective date of the HCV HAP contract.
(5)   Inapplicability of HCV eligibility requirements. Per the current definition of
      “admission” in 24 CFR §983.3, a family that receives a tenant-based HCV pursuant to
      this newly enacted provision is not a new admission to the HCV program and is not
      subject to income-eligibility or any other admission requirement. The family does not
      count toward the PHA’s income-targeting requirements at 24 CFR §982.201(b)(2)(i).
(6)   Termination of tenancy by owner. An owner may not terminate the tenancy of a family
      that exercises its right to remain except for in response to serious or repeated lease
      violations, or other good cause.
(7)   Family payment toward rent. A family that remains in its unit with continued tenant-
      based HCV assistance must pay the total tenant payment (determined under 24 CFR
      part 5 subpart F) and any additional amount by which the unit rent exceeds the
      applicable payment standard. The family’s initial share of the rent may exceed 40
      percent of the family’s adjusted monthly income, irrespective of the normally


                                        page 46 of 66
       applicable restriction on the amount a family may pay when initially assisted in any
       unit at 24 CFR §982.305(a)(5).
(8)    HCV program rules. All other HCV program rules apply to families who remain in the
       project.
With respect to additional contract conditions, HUD has chosen not to adopt any such
conditions at this time.




                                         page 47 of 66
Attachment L: Attaching PBVs to Certain PHA-Owned Projects Without Following a
Competitive Process
Regulation: 24 CFR § 983.51(b)
HOTMA Reference: Sec. 106 (a)(9), which adds Sec. 8(o)(13)(N) to the Act
Applicable Program: PBV
Summary of Change: HOTMA adds section 8(o)(13)(N) to the Act, which allows a PHA to
attach PBV assistance to units in a project in which the PHA has an ownership interest or over
which the PHA has control without following a competitive process. In order to exercise this
authority, the PHA must be engaged in an initiative to improve, develop, or replace a public
housing property or site.
Content:
(1)        PHA ownership interest. A project does not have to meet the definition of PHA-owned
           in order for the PHA to have an ownership interest in the project and to be covered by
           this HOTMA provision. An ownership interest means that the PHA or its officers,
           employees, or agents are in an entity that holds any direct or indirect interest in the
           project in which the units are located, including, but not limited to, an interest as:
           titleholder; lessee; stockholder; member, or general or limited partner; or member of a
           limited liability corporation. For purposes of this authority, a PHA ownership interest
           also includes a scenario in which the PHA is the lessor of the ground lease for the land
           upon which the PBV project to improve, develop, or replace the public housing
           property is located or will be constructed. Units that meet the definition of “PHA-
           owned” as defined here qualify for this exception. Alternatively, just having an
           ownership interest for the purpose of this provision does not equate with meeting the
           definition of PHA-owned as defined in Attachment A.
(2)        Conditions for non-competitive selection. In order to be subject to this non-
           competitive exception, the following conditions must be met:
           (a)      The PHA must be engaged in an initiative to improve, develop, or replace the
                    public housing properties or sites. The public housing properties or sites may
                    be in the public housing inventory or they may have been removed from the
                    public housing inventory through any available legal removal tool (which may
                    include but is not limited to disposition or demolition under Section 18 of the
                    Act, voluntary conversion under Section 22 of the Act, or required conversion
                    under Section 33 of the Act) within 5 years2 of the date on which the PHA
                    entered into the AHAP or HAP pursuant to the non-competitive selection.
           (b)      If the PHA plans rehabilitation or new construction, a minimum threshold of
                    $25,000 in hard costs per-unit is required.
           (c)      If a PHA plans to replace public housing by attaching project-based assistance
                    to existing housing in which the PHA has an ownership interest or over which
                    the PHA has control, then the $25,000 per-unit minimum threshold does not


2
    The date on which the unit was removed from IMS/PIC serves as the start date for the 5-year window.


                                                  page 48 of 66
             apply as long as the existing housing substantially complies with HUD’s
             housing quality standards. The PHA’s Administrative Plan must describe what
             it means to “substantially comply with HUD’s housing quality standards.”
      (d)    The PHA must explain in its Administrative Plan the work it plans to do on the
             property or site and how many units of PBV it plans to add. See Administrative
             Plan requirements in the Appendix II to this notice.
(3)   Other PBV requirements. In order to be non-competitively selected under this
      provision, the units must be eligible for PBV assistance in accordance with 24 CFR
      §983.53, and the selection of the units must satisfy all other statutory and regulatory
      requirements of the PBV program. Unless otherwise exempt, units non-competitively
      selected under this section are subject to the program cap and income-mixing
      requirements and exceptions discussed in Attachment F.




                                        page 49 of 66
Attachment M: Project-Basing Family Unification Program and HUD-VASH Vouchers
Regulation: 24 CFR §983
HOTMA Reference: Sec. 106(a)(9), which added a new Sec. §8(o)(13)(O) of the Act
Applicable Programs: HCV and PBV
Summary of Change: HOTMA allows PHAs to project-base Family Unification Program
(FUP) and HUD-Veterans Affairs Supportive Housing (VASH) vouchers without requiring
additional HUD approval. Prior to HOTMA, PHAs were prohibited from project-basing
vouchers awarded for FUP. HUD-VASH vouchers could be project-based, but required HUD
review and approval in accordance with Notice PIH 2015–10 (this applied to HUD-VASH
vouchers the PHA chose to project-base and not to HUD-VASH units awarded under a HUD-
VASH PBV allocation as described in Attachment F of this notice). This notice supersedes
Notice PIH 2015–10 in its entirety.
PHAs conduct their HUD-VASH programs in conjunction with the Veterans Affairs Medical
Center (VAMC). The VAMC must make supportive services available to individuals
receiving HUD-VASH assistance. Thus, when a PHA chooses to project-base its HUD-VASH
vouchers, it must ensure the VAMC will continue to make supportive services available to the
HUD-VASH families.
Content: HOTMA authorizes PHAs to project-base FUP and HUD-VASH vouchers in
accordance with the statutory and regulatory requirements of the PBV program.
(1)    Considerations. HUD encourages PHAs wishing to project-base FUP or HUD-VASH
       vouchers to include in their considerations whether the activity:
       •   Will yield significant benefit to participants;
       •   Will impact the availability of tenant-based FUP or HUD-VASH vouchers;
       •   Will impact voucher utilization; and
       In determining whether project-basing will yield significant benefit to FUP or HUD-
       VASH participants, HUD encourages PHAs to consider:
       •   The impact on choice and access to areas of higher opportunity.
       •   The success of FUP and HUD-VASH participants with tenant-based vouchers.
       •   How project-basing will improve FUP or HUD-VASH participants’ access to
           supportive services.
       In determining the impact of project-basing on the availability of tenant-based FUP or
       HUD-VASH vouchers, HUD encourages PHAs to consider:
       •   The extent of FUP or HUD-VASH vouchers to be project-based (percent of total
           FUP or HUD-VASH allocation).
       •   Unit size. FUP youth and HUD-VASH veterans typically require a smaller unit
           size, while FUP families typically require a larger unit size. Unit size
           determination will impact the availability of budget authority to issue vouchers
           (i.e., a large unit may cost more than a small unit).
       •   The 36-month time limit on youth FUP vouchers and whether youth will be less or

                                           page 50 of 66
         more likely to request a voucher to move.
      Project-basing FUP vouchers may be a part of a PHA strategy to provide supportive
      housing to youth and families. PHAs may leverage the project-based units with
      community based services and supports. Following this model would also allow a
      PHA to project-base additional units as a result of the service provision. (See
      Attachment E.)
      When a PHA chooses to project-base their HUD-VASH vouchers, they must ensure
      they have the support of the partnering VAMC. The PHA should maintain this
      documentation of support for their records.
(2)   Coordinated entry and referrals. PHAs may work with their local Continuum of Care
      (CoC), in cooperation with their local Public Child Welfare Agency (PCWA), to
      prioritize entry into FUP PBV units to ensure that the units are targeted to people who
      most need supportive housing. For HUD-VASH, VA partners would ensure that the
      units are targeted to people who most need supportive housing.
      For FUP, PCWAs and PHAs may accept referrals from CoCs for eligible youth in
      support of a community’s effort to prioritize assistance in FUP PBV units. Referrals
      from CoCs must be signed off on by the PCWA. For HUD-VASH, all referrals come
      from the partnering VAMC.
(3)   Limiting FUP vouchers to one category of FUP eligible families. A PHA that chooses
      to project-base FUP vouchers may limit the project-based vouchers to one category of
      FUP eligible participants (families or youth) or a combination of the two. FUP
      vouchers that are limited to youth cannot exclude eligible youth with children
      consistent with the nondiscrimination requirements under the Fair Housing Act. For
      example, a PHA may project-base vouchers at a service-rich site for youth. PHAs
      generally do not similarly limit HUD-VASH project-based vouchers to a category of
      eligible participants, unless the units are specifically for elderly HUD-VASH families.




                                        page 51 of 66
                           U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
                                        WASHINGTON, DC 20410-5000

OFFICE OF PUBLIC AND INDIAN HOUSING


Appendices
Appendix I. PBV Program Cap Calculation Instructions
This appendix provides step-by-step instructions that complement a sample PBV Program
Cap Calculation Worksheet that may be found here: PBV Program Cap Calculation
Worksheet. The instructions and sample worksheet follow the same organizational structure.
As applicable, the instructions reference corresponding step and line numbers of the
worksheet.
Use of the worksheet is optional. PHAs may use another form to calculate and submit the
program cap information to HUD.
Summary Table
PHAs are advised to complete Steps 1 through 5 of the worksheet first and then review the
“Summary Table.” This table contains embedded formulas that automatically calculate,
among other things, the 20 percent program cap and the 10 percent program cap exception
category, based on the information entered by the PHA in Steps 1 through 5. PHAs will be
unable to enter information in the Summary Table.
Based on the number of units a PHA has already project-based, the number it proposes to
project-base, the number of such units that are part of the exception category, and the number
that are excluded entirely from the program cap, the Summary Table will show whether the
PHA’s proposal will push it above the applicable program cap(s).
In cases where a PHA’s submission will place the PHA above a program cap, the Summary
Table will display in red the percent available under the respective cap. For example, if a PHA
proposes to project-base 11 percent of its available ACC units under the 10 percent exception
category, then the 10 percent program cap field in the summary table will be highlighted in
red. The PHA must then either reduce the number of exception units it proposes to project-
base or, if the 20 percent cap has not been met, it may move units to the 20 percent program
cap category. Likewise, if the PHA’s proposal will cause it exceed the 20 percent cap, then it
may move units to the 10 percent exception category, but only if the units are eligible and
there is room within the 10 percent category for additional units.
General Instructions for Completing Steps 1 through 5
In the column titled “HUD Approved,” enter the total number of units currently under a PBV
HAP contract, under an Agreement to Enter into a HAP contract (AHAP), and/or covered by a
notice of proposal selection.
In the column titled “Proposed,” enter the number of units proposed for project-basing.
In Steps 2 through 5, enter a zero in each category that is not applicable to your agency.
A unit that qualifies under more than one exception category must be recorded in only one
such category.
PHA Information – (lines 2-6):
Instruction: Enter the PHA number in line 2 and the PHA name in line 3.
Enter the name of the person most familiar with the information on the worksheet in line 4
and that person’s email in line 5.
Enter the date the PBV Program Cap Calculation Worksheet is being completed in line 6.


                                          page 53 of 66
Step 1: Number of ACC Authorized Units (Baseline) – (line 17)
Instruction: In line 17, record the number of authorized units (as described in Attachment C
of this notice). This number may be found in the Inventory Management System/PIH
Information Center (IMS/PIC).
As Steps 2 and 3 are completed, the number in line 17 may be reduced. This is because Steps
2 and 3 involve tabulating units that are exempt from the program cap.
Step 2: PBV Units that Previously Received Long-Term HUD Housing Subsidies, or
were Subject to a Rent Restriction as a Result of Certain HUD Loan Insurance
Programs (For PBV HAP Contracts that First Became Effective on or After April 18,
2017) – (lines 20-28)
Instruction: Record units that were previously subject to certain federal rent restrictions or
that received another type of long-term housing subsidy provided by HUD that do not count
toward the program cap when PBV assistance is attached (as described in Attachment F of
this notice). Lines 20-28 of the PBV Program Cap Calculation Worksheet lists the categories
applicable under this step. Units entered in any of the categories under this step must fully
comply with the conditions described in Attachment F of this notice.
Line 29 automatically calculates the total based on the information entered in lines 20-28.
PHAs will be unable to enter information in line 29.
Step 3: Other PBV units excluded from program cap calculation – (lines 32-35)
Instruction: Record other units excluded from the program cap (as described in Attachment F
of this notice). There are two categories under this step: RAD units (components 1 and 2) and
HUD-VASH units awarded under a HUD-VASH PBV set-aside allocation as described in
Attachment F of this notice. These categories are listed in lines 32 through 34.
Line 35 automatically calculates the total based on the information entered in lines 32-34.
PHAs will be unable to enter information in line 35.
Step 4: PBV Units Categorized Under 10% Increase for Eligible Units (For PBV HAP
Contracts First Executed On or After April 18, 2017) – (lines 38-41)
Instruction: Record units that qualify under the 10 percent program cap exception (as
described in Attachment D of this notice). Lines 38-41 of the PBV Program Cap Calculation
Worksheet list the categories applicable under this step.
Any PBV units awarded under a HUD-VASH PBV set-aside allocation will not qualify under
this step. They must instead be entered under Step 3, above. Any HUD-VASH vouchers the
PHA chooses to project-base as described in Attachment M of this notice may be recorded
here if they qualify for the 10 percent exception category described in Attachment D of this
notice.
Line 42 automatically calculates the total based on the information entered in lines 38-41.
PHAs will be unable to enter information in line 42.
Units added on or after April 18, 2017, through an amendment of a HAP contract that was
first executed prior to April 18, 2017, are not eligible for this 10 percent exception authority.




                                           page 54 of 66
Step 5: Total PBVs not Meeting an Exception (not contained in steps 2-4 above) – (lines
45-46)
Instruction: In line 45, record the number of HUD-approved units that do not meet the
criteria for being included under Steps 2, 3, or 4, above. In line 46, record such units that the
PHA proposes to project-base.




                                           page 55 of 66
Appendix II. PHA Plan, Administrative Plan, and Other PBV Topics
This appendix addresses PHA Plan requirements, Administrative Plan requirements, and other
PBV topics. It contains provisions of Notice PIH 2011–54 that are unchanged by HOTMA,
provisions that are added or changed by HOTMA, and additional guidance on the PBV
program that HUD is implementing via this appendix.
PHA Plan Requirements
In accordance with Section 7.0 of the PHA Plan Template (see Notice PIH 2015–18
(Availability of New and Revised Public Housing Agency (PHA) Five-Year and Annual Plan
Templates and Other Forms)) and the requirements of HOTMA, if a PHA intends to use the
PBV program, it must provide the projected number of PBV units, their general locations, the
work it plans to do on the property or site, how many units of PBV it is planning on adding to
the site, and how project-basing is consistent with its PHA Plan. Any amendment to the PHA
Plan regarding PBVs must be in accordance with 24 CFR 903.7(r)(2)(ii), which requires the
PHA to identify the basic criteria for determining a significant amendment or modification to
its 5-year or annual PHA Plan. When amending a PHA Plan, the agency must follow 24 CFR
903.21 which, in part, provides for adoption by the board of directors or similar governing
body and public notice and comment.
Administrative Plan Requirements
Listed below are those policies and procedures that must be addressed in the PHA’s
Administrative Plan.
(1)    Unchanged by HOTMA:
       (a)     The procedures for owner submission of PBV proposals and for selection of
               those proposals, such as method of providing public notice, deadline for
               submission and selection factors. See 24 CFR 983.51(a), (b) and (c). If the
               PHA intends to use both competitive and non-competitive procedures, it must
               describe under what conditions it will use each method of selection. It is
               acceptable for a PHA to state that it will only use competitive selection
               procedures when non-competitive selection is not applicable. However, if the
               PHA intends to use both competitive and non-competitive selection of
               proposals, the procedures above must be described in the Administrative Plan.
       (b)     The standard for deconcentrating poverty and expanding housing and
               economic opportunities must be described in the Administrative Plan in
               accordance with 24 CFR 983.57(b)(1). In addition, the PHA must establish its
               policy for selection of PBV sites and describe how the site selection policy
               promotes PBV goals.
       (c)     Applicants for PBV units must be selected from the PHA’s waiting list. The
               PHA’s Administrative Plan must describe how applicants will be selected.
               There are various options for a PHA in establishing PBV waiting lists. It may
               use separate lists for tenant-based assistance and PBV assistance or it can use
               one list for both. The PHA may establish separate waiting lists for different
               PBV projects or buildings (or for sets of such units). Different preferences may
               be established for each PBV waiting list. PHAs may take referrals from PBV


                                         page 56 of 66
            owners. However, all new applicants and families currently on the PHA’s
            tenant-based waiting list must be provided with the option to have their names
            placed on all/any open waiting lists that the PHA maintains for assisted
            housing. See 24 CFR 983.251. PHAs do not have to notify each family on the
            tenant-based waiting list by individual notice. A PHA could notify these
            applicants by the same means it would use in opening its waiting list under 24
            CFR §982.206(a). A non-exclusive or exhaustive list of suggestions are: (1)
            advertising through local and minority newspapers and the internet; (2) local
            postings at post offices, libraries, and community centers; and (3) an outreach
            to social service organizations that may serve the same clientele that will be
            occupying the PBV units.
      (d)   Any tenant screening done by the PHA must be stated in the Administrative
            Plan. See 24 CFR 983.255(a).
      (e)   The PHA must have a policy in its Administrative Plan regarding family
            occupancy of wrong-size or accessible units. In cases where, after initial
            tenancy, the family is occupying a wrong-sized unit or a unit that has
            accessibility features not required by the family, it must describe the form(s) of
            continued assistance it will offer the family. See 24 CFR 983.260(b).
      (f)   At the PHA’s discretion, the PBV HAP contract may provide for vacancy
            payments to the owner. Therefore, the PHA must decide if it will pay such
            vacancy payments as defined under 24 CFR 983.352. The maximum vacancy
            payment can be no more than two full months of monthly rent to owner under
            the assisted lease after the month the family moves out minus any portion of
            the rental payment received by the owner (including amounts available from
            the tenant’s security deposit). Vacancy payments can only cover the portion of
            time the unit remains vacant during the period defined.
(2)   Added or Changed by HOTMA:
      (a)   If a PHA plans to exceed the cap on the number of units in a project that may
            have PBV attached for non-elderly families (i.e., the greater of 25 dwelling
            units or 25 percent of the dwelling units in any project), the Administrative
            Plan must describe the types of services offered to families for a project to
            qualify for the exception and to the extent to which such services will be
            provided. Such supportive services need not be provided by the owner or on-
            site, but must be reasonably available to the families receiving PBV assistance
            in the project. A PHA may not require participation as a condition of living in
            an excepted unit for HAP contracts executed on or after April 18, 2017.
            although such services may be offered. See Attachment E of this notice for
            more information.
      (b)   A PHA must detail its intent to add PBV units without competition to an
            existing HAP contract along with its rationale for adding PBVs to the specific
            project.
      (c)   If A PHA has insufficient funds to cover its housing assistance payments, then
            the PHA must take cost-saving measures prior to terminating assistance


                                       page 57 of 66
             contracts. The list of cost-saving measures is found in Notice PIH 2011–28
             (“Cost-Saving Measures in the Housing Choice Voucher (HCV) Program”) or
             subsequent notices. If a PHA implements all of these cost-saving measures and
             still has insufficient funds to cover its housing assistance payments, then the
             PHA may choose to terminate payments under its HCV or PBV programs. A
             PHA may identify in its Administrative Plan any additional cost-saving
             measures that it will implement prior to terminating HCV or PBV assistance. A
             PHA may decide which type of assistance (HCV or PBV) to terminate first and
             must therefore identify in its Administrative Plan the factors it will take into
             consideration when deciding which type of assistance to terminate first. A
             PHA may identify in its Administrative Plan any additional cost-saving
             measures that it will implement prior to terminating HCV or PBV assistance
             and must identify in its Administrative Plan the factors it will take into
             consideration when deciding which type of assistance to terminate first.
      (d)    A PHA that will, without following a competitive process, attach PBVs to a
             public housing project in which it has an ownership interest or over which it
             has control, must detail the work it plans to do on the public housing property
             or site that it is improving, developing, or replacing and must state how many
             units it plans to project-base at the property or site. If the PHA plans to replace
             public housing by attaching PBVs to existing housing in which the PHA has an
             ownership interest or over which the PHA has control, then the existing
             housing must substantially comply with HUD’s housing quality standards, and
             the PHA must describe in its Administrative Plan what it means to
             “substantially comply with HUD’s housing quality standards.”
      (e)    A PHA making PBV units (not HUD-VASH) specifically available to house
             families that are comprised of or include a veteran under the exception
             category described in Attachment D of this notice must define “veteran.”
      Additional administrative policies regarding HQS will be addressed in another notice.
(3)   Additional PBV Guidance Implemented via this Appendix:
      (a)    A PHA may adopt a policy in its FSS Action Plan that allows families that
             have left the FSS program without completing the FSS contract to re-enroll in
             the FSS program. If the PHA would like to adopt such a policy for non-FSS
             families that have failed to complete their supportive services requirements,
             then that policy must be included in the PHA’s Administrative Plan.
      (b)    The PHA’s Administrative Plan must define the term “project.” See paragraph
             (7) of this Appendix II for more information.
      (c)    The Administrative Plan must address the effective dates of the Small Area
             FMR designation, if applicable, and how this will apply to PBV units in
             accordance with 24 CFR 888.113(h).




                                        page 58 of 66
Other PBV Topics
(1)     Agreement to Enter into a Housing Assistance Payments (AHAP) Contract.3 For any
        projects involving new construction or rehabilitation, an AHAP must be executed prior
        to the start of any construction or rehabilitation. An AHAP is not required for existing
        units. The requirements regarding an AHAP are detailed in 24 CFR §983.152. A PHA
        may not execute an AHAP until a subsidy layering review and an environmental
        review are completed.
(2)     Subsidy Layering Review (SLR). The purpose of an SLR is to avoid excess subsidy.
        See 24 CFR §983.55 and 79 Fed. Reg. 57955 (Sept. 26, 2014). SLRs are required only
        for projects involving new construction and rehabilitation. The Federal Register
        notice, Administrative Guidelines; Subsidy Layering Reviews for Section 8 Project-
        Based Voucher Housing Assistance Payments Contracts and Mixed-Finance
        Development, issued on September 26, 2014, provides that qualified housing credit
        agencies (HCA) must follow certain administrative guidelines in performing subsidy
        layering reviews in accordance with the requirements of the Housing and Economic
        Recovery Act (HERA) of 2008 in those cases where the HCA elects to conduct such
        reviews for mixed-finance public housing projects and for newly constructed and
        rehabilitated structures combining other forms of government assistance with project-
        based voucher assistance.
(3)     Environmental Review. In accordance with 24 CFR 983.58, an environmental review
        is required for all PBV units including existing units. A PHA, an owner, or its
        contractors may not acquire, rehabilitate, convert, lease, repair, dispose of, demolish,
        or construct real property or commit or expend program or local funds for PBV
        activities until an environmental review is completed. Specifically, no AHAP for
        rehabilitated or new construction units may be executed until the environmental
        review is complete and no housing assistance payments (HAP) contract may be
        executed for existing units until the environmental review is completed.
(4)     Physical Accessibility. PBV projects must meet program accessibility requirements of
        24 CFR 983.102. A PHA must ensure compliance with the accessibility requirements
        of Section 504 of the Rehabilitation Act (Section 504) and Title II of the Americans
        with Disabilities Act (ADA), as well as the design and construction requirements of
        the Fair Housing Act, as applicable. 24 CFR part 8 (Section 504); 24 CFR part 100
        (Fair Housing Act); 28 CFR part 35 (Title II of the ADA).
(5)     Equal Opportunity and Civil Rights Requirements. A PBV program must comply with
        all applicable equal opportunity and nondiscrimination requirements as required by 24
        CFR 983.8. The PHA must certify that it will carry out its 5-Year and Annual Plan in
        conformity with all applicable fair housing and civil rights laws and that it will
        affirmatively further fair housing, which means that it will take meaningful actions to
        further the goals identified in its Assessment of Fair Housing (AFH) conducted in
        accordance with the requirements of 24 CFR §5.150 through §5.180, that it will take


3
  This provision has been changed by HOTMA, but HUD has not yet implemented the change. The information in
this section still applies until further notice.


                                              page 59 of 66
      no action that is materially inconsistent with its obligation to affirmatively further fair
      housing, and that it will address fair housing issues and contributing factors in its
      programs. 24 CFR 903.7(o). Under HUD’s AFFH regulation, PHAs receiving
      assistance under Section 8 or Section 9 of the 1937 U.S. Housing Act are required to
      conduct and submit an AFH. 24 CFR §§5.150 et eq. See also 82 Fed. Reg. 4373 (Jan.
      13, 2017).
(6)   Special Housing Types. Special housing types that are eligible to be assisted under the
      PBV program (i.e., single room occupancy units, congregate housing, group homes,
      and cooperative housing) are subject to the same inspection requirements and
      exceptions as any other PBV units. Of the special housing types, shared housing,
      manufactured home space rental, and the homeownership option are ineligible to be
      assisted under the PBV program. PHAs must consider requests for reasonable
      accommodations that may be necessary for a qualified individual with disabilities to
      benefit from the program (in accordance with the Fair Housing Act, Section 504 of the
      Rehabilitation Act, title II of the Americans with Disabilities Act and implementing
      regulations at 24 CFR 100.204, 24 CFR 8.33, and 28 CFR 35.130). For example,
      approval of a live-in aide may be necessary as a reasonable accommodation.
      Reasonable accommodations are determined on a case-by-case basis.
(7)   Definition of Project. The PBV statute defines project as a single building, multiple
      contiguous buildings, or multiple buildings on contiguous parcels of land. This
      definition was unchanged by HOTMA. PHAs have discretion to define a project
      within the parameters of the statutory definition. That is, a PHA may define a project
      as a single building, or as multiple contiguous buildings, or as multiple buildings on
      contiguous parcels of land.
      PBV HAP contracts are executed for projects based on how the PHA has defined the
      term in its Administrative Plan. For example, if the PHA defines “project” as a single
      building, then one HAP contract is executed for each building being project-based.




                                          page 60 of 66
Appendix III. Reporting
The content of this appendix comes from Section I of Notice PIH 2015–05. It is unchanged
(with the exception of VMS reporting) and is simply included here in order to consolidate
PBV guidance. Sections II and III of Notice PIH 2015–05 were changed by HOTMA and are
therefore revised in the respective applicable attachments of this notice.)
Timely Reporting Requirements of the Family Report (form HUD-50058 and form HUD-
50058 MTW) into the Inventory Management System/Public and Indian Housing Information
Center (IMS/PIC) and Timely Submissions into the Voucher Management System (VMS) for
Project-Based Vouchers.
(1)    Reporting PBV in IMS/PIC. To ensure that families occupying PBV units are recorded
       properly in IMS/PIC, PHAs must complete section 11 (Section 8: Project Based
       Certificates and Vouchers), lines 11b through 11an, as applicable, of the form HUD-
       50058. The remaining sections of the form HUD-50058 must be completed the same
       as for regular Housing Choice Voucher (HCV) participants with the following
       exceptions:
       (a)    Action Codes 10, Issuance of a Voucher and 11, Expiration of Voucher. Action
              codes 10 and 11 do not apply to the PBV program. PHAs do not need to enter
              action code 10 or 11 on the form HUD-50058 for participants that will occupy
              PBV units.
       (b)    Payment Standards. Payment standards do not apply to the PBV program.
       (c)    Portability. Since portability does not apply to the PBV program, action codes
              4 (portability move-in) and 5 (portability move-out) must not be used on line
              2a. Also, lines 11d through 11f must be left blank.
       MTW PHAs administering PBV must complete section 21, MTW Tenant-Based or
       Project-Based Assistance, of the form HUD-50058 MTW. The remaining sections of
       the form HUD-50058 MTW must be completed as normal except for 21m, Flat
       Subsidy Amount, which does not apply to the PBV program.
(2)    Correcting the Form HUD-50058 Report when Section 12 was Incorrectly Used. In
       cases where a PHA has reported a PBV participant in section 12, Housing Choice
       Vouchers: Tenant Based Vouchers, of the form HUD-50058 in error, the PHA must
       correct the record by entering the family data in section 11 no later than the family’s
       next recertification. Section 11 must be used for families participating in the PBV
       program since, under the PBV program, families never pay more than TTP (as
       reflected in section 11 of the 50058).
       PHAs that correct an error must determine if the participant has been paying an
       incorrect rent amount. If so, the PHA must correct the errors starting from the time the
       incorrect reporting began and reimburse any amounts owed to the family.
(3)    Reporting Voucher Issuance. A family participating in the PBV program is eligible for
       tenant-based voucher assistance under the HCV program after the family’s first year in
       occupancy in the PBV unit, if and when such assistance (or other comparable
       assistance) becomes available. When the PHA issues a family receiving PBV
       assistance a HCV, it must enter action code 10 on the form HUD-50058. The PHA


                                          page 61 of 66
           continues to record the participant as VO on line 1c of the form HUD-50058 and does
           not enter an End of Participation (EOP) entry for the participant. If the PHA cannot
           enter a portability move out (action code 5) on the form HUD-50058 (line 2a) for a
           PBV family that wants to port, the PHA should contact its PIC coach. HUD is aware
           that this is an issue with PBV family reports and will work with PHAs to resolve this
           issue until the PIC system can be modified to accept this action code for PBV families
           who want to port.
(4)        Timely IMS/PIC Reporting. Through Notice PIH 2011–65, HUD established the
           requirement of timely submission of form HUD-50058 and form HUD-50058 MTW.
           The Department requires that form HUD-50058 must be submitted no later than 60
           calendar days from the effective date of any action recorded on line 2b.
(5)        Timely VMS Submissions. Notice PIH 2012–21 is applicable to all PHAs
           administering the voucher program and establishes submission requirements for the
           VMS. The Department uses VMS data for budget formulation, cash management,
           monitoring, determining renewal funding levels, and funding-related factors under the
           Section Eight Management Assessment Program (SEMAP). Therefore, it is imperative
           that PHAs comply with VMS reporting requirements and timelines, ensuring that the
           information submitted is both timely and accurate. The data submitted in the VMS is
           subject to verification and review by the PIH Office of Housing Voucher Programs
           Quality Assurance Division. PHAs are required to submit leasing and cost data in the
           VMS on a monthly basis; each month’s data is submitted during the subsequent
           month. The VMS is available for regular submissions from the 4th through the 22nd of
           each month. Adjustments to previous months' reported VMS data may be entered at
           any time by utilizing the Prior Month Correction (PMC) module. Additional
           information such as how to use the system, prior month corrections, viewing data and
           generating reports is found in the VMS User’s Manual.4
           VMS data reporting is time sensitive, and requests to extend submission deadlines will
           not be considered. However, PHAs that are not able to meet reporting deadlines due to
           circumstances beyond their control must notify the FMC at
           Financial_Management_Center@hud.gov. PHAs that do not submit the required data
           by the reporting deadline may be subject to a withholding or offset of administrative
           fees.
           (a)      Reporting the number of PBVs under an AHAP, but not under a HAP. In this
                    field, the PHA reports the number of PBVs under an AHAP only. These units
                    are not reported in any other field.
           (b)      Reporting the number of PBVs under a HAP and leased. In this field, the PHA
                    reports the total number of PBVs that are under a HAP contract and leased.
                    These units and associated expenses are also reported in the field that best
                    describes the type of voucher being used (Tenant Protection, All Other
                    Vouchers (AOV), etc.)



4
    Click here to be taken to the online version of the VMS User’s Manual.


                                                   page 62 of 66
      (c)    Reporting the number of PBVs under a HAP contract that are not leased and
             not receiving vacancy payments. These vouchers are not reported in any other
             field, but are eligible for administrative fees.
      (d)    Reporting the number of PBVs under a HAP contract and not leased with
             Vacancy Payments and Associated Vacancy HAP expenses. In this field, the
             total number of PBVs that are under a HAP contract and are not leased, but are
             receiving vacancy payments. These vouchers are not reported in any other field
             but are eligible for administrative fees.
      (e)    Reporting HAP Expenses. Include the number of PBVs under a HAP contract
             and not leased with Vacancy Payments and Associated Vacancy HAP
             Expenses. The total HAP expense associated with PBVs under a HAP contract
             and not leased with vacancy payments. These expenses are also reported in the
             AOV HAP expense field. NOTE: RAD Rehab Assistance payments should not
             be reported in the field, but should be reported in the RAD 1 HAP expense
             field.
(6)   Non-Compliance. Pursuant to 24 CFR §982.152(d), HUD may reduce or offset any
      administrative fee to the PHA, in the amount determined by HUD, if the PHA fails to
      perform PHA administrative responsibilities correctly or adequately under the program
      (for example, failure to submit form HUD-50058 or to complete VMS data reporting
      on a timely basis or at all).
      If the PHA fails to comply with reporting requirements, HUD may reduce the PHA’s
      administrative fees. The reduction will be calculated beginning the first day of the
      month following the submission closing due date. The monthly reduction will continue
      until such time as the PHA complies with the reporting requirements or a waiver is
      granted. The imposition of such reductions will be communicated under separate cover
      and may represent a permanent reduction in funding for administrative fees for the
      current calendar year that shall not be reversed. However, this will not impact the
      baseline administrative fee calculations.




                                       page 63 of 66
Appendix IV. HCV, Homeownership, and PBV Inspection Requirements
(1)       Overview. HCV program inspection requirements are governed by 24 CFR Part 982,
          Subpart I. Most HCV inspection requirements are applicable to the PBV program and
          to the Homeownership Option, but there are a number of HCV inspection
          requirements that do not apply to either of these programs:
          •        Table 1 lists the HCV inspection requirements that do not apply to the PBV
                   program. The provisions not applicable to the PBV program are found at 24
                   CFR §983.2(c)(4) and 24 CFR §983.101(a).
          •        Table 2 lists the HCV inspection requirements that do not apply to the
                   Homeownership Option. The provisions not applicable to the Homeownership
                   Option are found at 24 CFR §982.641(d).

              Table 1: HCV Inspection Requirements Not Applicable to the PBV Program

      Regulation                  HCV Provision                                     Reason

    24 CFR           Lead-based paint requirements under         While 24 CFR §982.401(j) does not apply to
  §982.401(j)        the Lead-Based Paint Poisoning              the PBV program, lead-based paint
                     Prevention Act (42 U.S.C. 4821–4846),       requirements apply to the PBV requirement
                     the Residential Lead-Based Paint            by virtue of 24 CFR §983.4 and 24 CFR
                     Hazard Reduction Act of 1992 (42            §983.101(c).
                     U.S.C. 4851–4856), and implementing
                                                                 Part 35, subparts A, B, H, and R (instead of
                     regulations at part 35, subparts A, B,
                                                                 subpart M) of the lead-based paint
                     M, and R.
                                                                 implementing regulations apply to the PBV
                                                                 program.

    24 CFR           Entering the unit size on the voucher       Not applicable to the PBV program — unlike
 §982.402(a)(3)      issued to the family.                       the HCV program, PBV families are not issued
                                                                 a Housing Choice Voucher.

    24 CFR           Effect of family unit size in the           Not applicable to the PBV program — unlike
  §982.402(c)        amount of subsidy.                          the HCV program, payment standards are not
                                                                 used to determine the amount of rent paid
                                                                 by a family under the PBV program.

    24 CFR           Size of unit occupied by the family.        Not applicable to the PBV program — unlike
  §982.402(d)                                                    the HCV program, payment standards are not
                                                                 used to determine the amount of rent paid
                                                                 by a family under the PBV program.

       24 CFR        Terminating the HAP contract when           PBV requirements for family occupancy of
      §982.403       the unit is too small.                      wrong-size units are found at 24 CFR
                                                                 §983.260.




                                                 page 64 of 66
  24 CFR        PHA requirement for initial and            Requirements on timing of inspections for
§982.405(a)     periodic unit inspection.                  the PBV program are found at 24 CFR
                                                           §983.103.

  24 CFR        Enforcement of HQS — neither the           HQS enforcement provisions related to the
 §982.406       family nor any other party other than      PBV program are found in 24 CFR
                the PHA or HUD, has the right to           §983.101(d).
                require enforcement of the HQS
                requirements by HUD or the PHA, or
                to assert any claim against HUD or the
                PHA for alleged failure to enforce
                HQS.



   Table 2: HCV Inspection Requirements Not Applicable to the Homeownership Option

Regulation                 HCV Provision                                      Reason

 24 CFR       Terminating the HAP contract when the        Not applicable to the Homeownership Option
§982.403      unit is too small.                           — unlike the HCV program, there is no HAP
                                                           contract between the PHA and the landlord
                                                           under the Homeownership Option.

 24 CFR       Owner and family responsibility for          Not applicable to the Homeownership Option
§982.404      maintenance of the unit and PHA              — unlike the HCV program, the family is not
              remedies.                                    under a lease but is rather the owner of the
                                                           unit. Family obligations under the
                                                           Homeownership Option are found at 24 CFR
                                                           §982.633.

 24 CFR       PHA requirement for initial and periodic     Not applicable to the Homeownership Option
§982.405      unit inspection.                             — unlike the HCV program, the PHA is not
                                                           required to conduct periodic inspections after
                                                           the initial inspection, although the PHA may
                                                           establish a policy in its Administrative Plan
                                                           that periodic inspections will be conducted.



     PBV program-specific inspection requirements, which supplement the HCV inspection
     requirements that do apply to the PBV program, are found at 24 CFR Part 983,
     Subpart C. Likewise, program-specific inspection requirements specific to the
     Homeownership Option are found at 24 CFR §982.631(a).
     See Attachment I of this notice for more information on PBV biennial inspection
     requirements.



                                           page 65 of 66
(2)   PBV Pre-Selection Inspections. PHAs are required to inspect the proposed site before
      the selection proposal date. This requirement is applicable to all housing types
      (existing, new, and rehabilitated housing). Pre-selection inspection considerations
      include, but are not limited to, adequacy of streets and utilities, and whether the size,
      contour, and exposure of the property is suitable for the planned development.




                                         page 66 of 66

Source: Legislative text reproduced verbatim
Plain English

PIH Notice 2017-21 provides implementation guidance for changes made by the Housing Opportunity Through Modernization Act of 2016 (HOTMA) to the Housing Choice Voucher (HCV) and Project-Based Voucher (PBV) programs. The notice revises how PHA-owned housing is defined, adjusts program and project caps on the number of units that can receive PBV assistance, extends maximum HAP contract terms from 15 to 20 years, and consolidates prior PBV guidance into a single reference document. It also establishes new rules for independent entity oversight of PHA-owned units, non-competitive PBV attachments, and the project-basing of FUP and HUD-VASH vouchers.

Written by anthropic/claude-sonnet-4.6 · Reviewed on October 7, 2026

Plain English — not legal advice.

For Property Managers

Under PIH Notice 2017-21, property owners participating in the PBV program should be aware that HAP contract terms may now extend up to 20 years initially, with an additional 20-year extension available. Owners of PHA-owned units must work with a HUD-approved independent entity for rent determinations, inspections, and contract term agreements. Owners are also required to provide at least one year's advance written notice to the PHA and tenants before a HAP contract terminates or expires without extension, per the notice's Attachment K.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

PIH Notice 2017-21 strengthens protections for families assisted under the PBV program, most notably by establishing that when a PBV HAP contract expires or terminates without extension, assisted families generally have the right to remain in their unit using tenant-based HCV assistance, provided the unit meets housing quality standards and the rent is reasonable. Tenants in PHA-owned units have the added protection of an independent entity conducting inspections and rent determinations under Attachment B of this notice. Tenants who believe their rights under this notice are not being honored may contact their local Public Housing Agency, reach out to a HUD field office, or consult a tenant-rights organization for guidance.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated October 7, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Current
Oct 6, 2026
Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 574.605
§ 574.605 Applicability of uniform administrative requirements, cost principles, and audit requirements for Federal awards.
§ 574.625
§ 574.625 Conflict of interest.
§ 574.645
§ 574.645 Coastal barriers.

Source Information

Snapshot SHA:
Fetched:Oct 6, 2026, 10:13 PM UTC