Nyack, N.Y., Code of Ordinances ch. 263 (eCode360 ed. 2026) § 263-12

Property under construction

In Force
Verified 11/9/2026 · Next check 2/7/2027
NyackStatutory Standards

Operative Text

Nyack, N.Y., Code of Ordinances ch. 263 (eCode360 ed. 2026) § 263-12
A. For purposes of enforcement of this chapter, if work is being done on the property, either the prime or general contractor or the owner shall be held responsible. B. Materials may be stored in any area of the property upon which construction is being carried on, provided that the method of storage and the materials stored are in compliance with the requirements of this chapter. In no event shall such storage be permitted for a period exceeding one year. C. Drainage crossing the property being developed must be maintained during the period of development, and no materials may be stored, land disturbed or other work done to interfere with existing drainage. D. The person responsible as herein shall take all necessary and reasonable steps to ensure that there will not be an unusual or unwarranted amount of dust and debris blown onto or across neighboring or nearby properties. E. Construction roads must be oiled or kept wet or properly treated to decrease the spread of dust and mud. F. A temporary cover such as rye grass or a mulch must be applied on land that has been stripped of its protective vegetation during the course of its construction to prevent the spread of dust and mud. G. All excavations in or near a public or private walkway or street must be properly guarded and protected at all times by lights, flags, barricades or other warnings sufficient in kind and amount to warn the public of the danger of falling into the excavation. H. Temporary electrical service must be through electric lines that are weather- and waterproof; such lines must not cross public walkways or highways on the ground, nor shall they be placed on the ground in areas subject to construction equipment traffic. I. Grounds and buildings must be kept free of debris, such as broken glass, boards with fastenings protruding and other articles making travel around the job site dangerous and unsafe.
Source: Legislative text reproduced verbatim
Plain English

Section 263-12 of Nyack's Code of Ordinances governs construction sites within the village, placing responsibility for compliance on either the prime/general contractor or the property owner. The provision sets rules for material storage (limited to one year), dust and debris control, drainage maintenance, excavation safety, temporary electrical lines, and site cleanliness. It is designed to protect neighboring properties and the general public from hazards that commonly arise during construction activity.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 9, 2026

Plain English — not legal advice.

For Property Managers

Under ch. 263 § 263-12, property owners who undertake construction projects in Nyack are jointly accountable with their contractors for meeting all site-management standards outlined in the chapter. Compliant operators typically ensure that stored materials do not remain on-site beyond one year, that dust suppression measures such as oiling construction roads or applying temporary ground cover are in place, and that excavations near walkways are properly barricaded with lights or flags. Keeping the site free of dangerous debris and maintaining existing drainage patterns throughout the project are also standard practices under this provision.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Section 263-12 establishes public-safety and neighbor-protection standards for construction sites in Nyack, which can affect tenants living near or in buildings undergoing work. If a construction project appears to be creating hazardous conditions—such as unguarded excavations, excessive dust blowing onto neighboring properties, or debris-strewn grounds—residents may report concerns to the village's code enforcement office, which has authority to hold the owner or contractor responsible under this chapter. Tenant-rights organizations or a housing attorney can help clarify what remedies may be available if a violation under § 263-12 is affecting a rental property.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

Rules and statutes that cite this regulation

Nyack Code § 263-16
Nyack Code § 263-18
Nyack Code § 263-13

Related Rules

§ 192-8
Penalties for offenses
§ 157-2
Legislative intent
§ 244.850
Basement space may be habitable

Source Information

Snapshot SHA:
Fetched:Nov 9, 2026, 08:37 PM UTC