North Hempstead, N.Y., Code of Ordinances ch. 8 (eCode360 ed. 2026) § 8-9

Issuance of license

In Force
Verified 11/9/2026 · Next check 2/7/2027
North HempsteadInspections, Registration & Licensing

Operative Text

North Hempstead, N.Y., Code of Ordinances ch. 8 (eCode360 ed. 2026) § 8-9
A. The Building Commissioner shall not issue any license until he shall have caused a review of all application materials and an inspection of the premises to be licensed and until he is satisfied that the provisions of this chapter, the Uniform Code and all other applicable laws, ordinances, codes, rules and regulations pertaining to multiple residences have been complied with and that the required fee has been paid. B. If, after the review described above, the Building Commissioner is satisfied that the multiple residence meets all applicable standards, he shall issue a multiple residence license. The license shall remain in effect for two years from the date of issue. C. If, after the review described above, the Building Commissioner is not satisfied that the multiple residence meets all applicable standards, he shall detail the specific problems and provide them to the applicant. If the applicant has not cured the problems within the time allotted by the Building Commissioner, the application shall be denied and a license shall not be issued.
Source: Legislative text reproduced verbatim
Plain English

Under North Hempstead Code ch. 8 § 8-9, the Building Commissioner must review all application materials and physically inspect a property before any multiple residence license can be issued. A license is granted only when the property meets all applicable standards—including the Uniform Code and other relevant laws—and the required fee has been paid; it then remains valid for two years. If deficiencies are found, the applicant is given a specific list of problems and a deadline to correct them, and failure to do so results in denial of the license.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 9, 2026

Plain English — not legal advice.

For Property Managers

Operators of multiple residences in North Hempstead should be aware that, under ch. 8 § 8-9, the Building Commissioner will conduct both a document review and an on-site inspection before issuing a license. Compliant operators ensure that all applicable codes, ordinances, and regulations are satisfied and that the required fee is submitted with the application. If the Commissioner identifies deficiencies, operators generally address each cited problem within the allotted timeframe to avoid denial and the need to restart the licensing process.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Section 8-9 of North Hempstead Code ch. 8 establishes that a multiple residence must pass a formal review and inspection before it can be legally licensed, and that license is only valid for two years. Tenants can check whether their building holds a current, valid multiple residence license as a baseline indicator of regulatory compliance. Those with concerns about whether their building meets applicable standards may contact the North Hempstead Building Department or consult a local tenant-rights organization to understand available options.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

Rules and statutes that cite this regulation

North Hempstead Code § 8-14

Related Rules

§ 14.544
LICENSE REQUIREMENTS
§ 14.545
STANDARDS FOR HEALTH, SAFETY AND NUISANCE PREVENTION
§ 14.546
SANCTIONS AND PENALTIES

Source Information

Snapshot SHA:
Fetched:Nov 9, 2026, 08:45 PM UTC