New Hyde Park, N.Y., Code of Ordinances ch. 139 (eCode360 ed. 2026) § 139-6

Construction site maintenance

In Force
Verified 11/10/2026 · Next check 12/10/2026
New Hyde ParkHabitability & Repair

Operative Text

New Hyde Park, N.Y., Code of Ordinances ch. 139 (eCode360 ed. 2026) § 139-6
A. Any portable toilet to be maintained upon a construction site shall be maintained in the front portion of the subject lot until such time as the foundation is capped and backfiiled. At such time, any such portable toilet shall be maintained upon the rear portion of the subject lot. This requirement may be varied only in the discretion of the Board of Trustees upon good cause shown. B. Construction sites shall be maintained in a safe and sanitary manner and all debris, litter and overgrowth thereon shall be removed.
Source: Legislative text reproduced verbatim
Plain English

Under New Hyde Park, N.Y., Code of Ordinances ch. 139 § 139-6, construction sites in the village must be kept safe and sanitary, with all debris, litter, and overgrowth removed. Portable toilets on a construction site are required to be placed in the front portion of the lot until the foundation is capped and backfilled, after which they must be moved to the rear of the lot. The Board of Trustees has discretion to allow exceptions to the portable toilet placement rule when good cause is demonstrated.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 9, 2026

Plain English — not legal advice.

For Property Managers

Property owners and contractors managing construction sites in New Hyde Park should be aware that ch. 139 § 139-6 sets specific requirements for site upkeep and portable toilet placement. Compliant operators generally position portable toilets at the front of the lot during early construction phases, then relocate them to the rear once the foundation is capped and backfilled, and maintain the overall site free of debris, litter, and overgrowth throughout the project. If site conditions make strict compliance with the placement rule impractical, operators typically document their circumstances and seek a variance from the Board of Trustees before deviating from the standard requirement.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

While ch. 139 § 139-6 primarily governs construction site operators, neighboring residents and community members may have an interest in knowing that this provision requires construction sites to be maintained in a safe and sanitary condition, with debris and overgrowth removed. If a nearby construction site appears to be out of compliance—whether due to unsanitary conditions or improper portable toilet placement—residents can generally report concerns to the New Hyde Park village government for review. Tenant-rights organizations or local housing advocates can help identify the appropriate municipal contact or process for raising such concerns.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

Rules and statutes that cite this regulation

New Hyde Park Code § 139-39
New Hyde Park Code § 139-15
New Hyde Park Code § 139-35
New Hyde Park Code § 139-8

Related Rules

§ 244.260
Compliance required
§ 14.567
ADOPTED BY REFERENCE
§ 244.340
Sewer and water connections

Source Information

Snapshot SHA:
Fetched:Nov 9, 2026, 10:08 PM UTC