Manchester, N.Y., Code of Ordinances ch. 217 (eCode360 ed. 2026) § 217-55
Application for building permit
Operative Text
All person desiring to purchase and install a factory manufactured home shall accompany their application for a building permit with the following: A. A site plan and plot plan of the lot upon which it is proposed to install said home which shall show the location of the home, driveways, sidewalks, improvements and the manner in which the lot is to be landscaped. B. A manufacturer's brochure showing the floor plan and specifications regarding plumbing and wiring. C. Foundation. Details of the manner in which the foundation upon which the home will be installed is to be constructed.
Manchester, N.Y., Code of Ordinances ch. 217 § 217-55 establishes what documentation must accompany a building permit application for a factory-manufactured home. Applicants are required to submit a site and plot plan showing the home's placement and landscaping, a manufacturer's brochure with floor plan and utility specifications, and detailed foundation construction plans. The rule ensures that local officials have enough information to evaluate the proposed installation before a permit is issued.
Plain English — not legal advice.
Under Manchester, N.Y., Code of Ordinances ch. 217 § 217-55, operators and property owners who intend to place a factory-manufactured home on a lot generally prepare a complete permit package before beginning any work. A compliant application typically includes a detailed site and plot plan, the manufacturer's brochure covering plumbing and wiring specifications, and engineered or detailed foundation plans. Keeping copies of all submitted documents on file helps demonstrate compliance throughout the installation process.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Manchester, N.Y., Code of Ordinances ch. 217 § 217-55 sets out the documentation requirements that must be met before a building permit for a factory-manufactured home can be processed. Prospective residents or buyers have an interest in confirming that a proper permit was obtained and that all required plans — including site layout, manufacturer specifications, and foundation details — were submitted and approved. Those with questions about whether a home was permitted in accordance with this provision may contact the local building or code enforcement office, or reach out to a tenant-rights organization for general guidance.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 10, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API