Bath, N.Y., Code of Ordinances ch. 72 (eCode360 ed. 2026) § 72-30

Specific requirements

In Force
Verified 11/9/2026 · Next check 2/7/2027
BathInspections, Registration & Licensing

Operative Text

Bath, N.Y., Code of Ordinances ch. 72 (eCode360 ed. 2026) § 72-30
Each manufactured home park shall meet the following minimum requirements: A. Manufactured home units shall have a minimum distance separation of 10 feet from other manufactured home units or structures, except that separation between the rear ends of two manufactured homes shall be at least six feet, or three feet from the lot line. B. No setback shall be required from internal streets. C. Yard depth from external public street: 25 feet from the edge of the pavement and one foot from any other park boundary. D. Accessory buildings shall be located at a minimum of three feet from any manufactured home or building. E. Parking. At least one parking space shall be provided for each manufactured home stand, plus one additional parking space, either on- or off-street, for every two manufactured homes. However, in no case shall the amount of parking currently available be reduced. F. Street width. Manufactured home park streets shall comply with the following minimum street widths: (1) One traffic lane (one-way street) with parking permitted on both sides, minimum width: 25 feet. (2) Pavement width: a minimum of 10 feet paved travel lanes.
Source: Legislative text reproduced verbatim
Plain English

Section 72-30 of Bath, N.Y., Code of Ordinances Chapter 72 establishes minimum physical standards for manufactured home parks within the village. These standards govern spacing between homes and structures, setbacks from streets and park boundaries, accessory building placement, parking availability, and internal street widths. The rules are designed to ensure safe separation of structures, adequate vehicle access, and sufficient parking throughout a park.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 9, 2026

Plain English — not legal advice.

For Property Managers

Operators of manufactured home parks in Bath must ensure their properties conform to the spacing, setback, parking, and street-width minimums set out in § 72-30. In practice, compliant parks maintain at least 10 feet between most units and structures (with a 6-foot rear separation or 3-foot lot-line clearance), provide at least one parking space per stand plus one additional space for every two homes, and keep internal streets at the widths specified in the ordinance. Existing parking supply may not be reduced below current levels, so any redevelopment or reconfiguration should account for that floor.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Residents of manufactured home parks in Bath, N.Y., have an interest in knowing that § 72-30 sets enforceable minimum standards for how the park must be laid out, including spacing between homes, parking availability, and road widths. If conditions in a park appear to fall short of these minimums—such as inadequate parking or structures placed too close together—tenants may consider raising the issue with the Village of Bath's local code enforcement office. Tenant-rights organizations familiar with New York manufactured housing law can also help residents understand what options may be available when a park appears to be out of compliance.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 14.544
LICENSE REQUIREMENTS
§ 14.545
STANDARDS FOR HEALTH, SAFETY AND NUISANCE PREVENTION
§ 14.546
SANCTIONS AND PENALTIES

Source Information

Snapshot SHA:
Fetched:Nov 9, 2026, 10:12 PM UTC