Barton, N.Y., Code of Ordinances ch. 97 (eCode360 ed. 2026) § 97-30
Preliminary application for permit
Operative Text
A. A preliminary application for a mobile home park permit must be obtained from and filed with the Town Clerk. A nonrefundable filing fee as determined by the Town Board will be retained by the town. B. A preliminary application must contain: (1) The name and address of the property owner and name and address of the applicant, if different. (2) A legal description of property on which the proposed park will be located, including the book and page reference to the deed recording and the tax map designation of the property. (3) For mobile home parks of two or more lots, a map of the proposed park, drawn by a licensed architect or engineer, must be enclosed with said application and must contain: (a) General layout plan of the proposed park, including the estimated number of lots, lot size locations, recreation areas, accessory buildings and service buildings. (b) Abutting property owners and their existing property use. (c) Proposed access and ingress routes and internal streets. (d) Present and proposed method of sewer and water service and other utility lines. (e) Any unusual special land features such as streams, creeks, areas subject to flooding and areas of steep slopes in excess of 10%. (4) Said application, when completed, filed and fee deposited, shall be submitted to the Town Board at its next scheduled regular meeting.
Section 97-30 of Barton, N.Y., Code of Ordinances ch. 97 establishes the preliminary application process that must be completed before a mobile home park permit can be issued. Anyone seeking to develop a mobile home park must file a specific application with the Town Clerk, pay a nonrefundable fee set by the Town Board, and include detailed information about the property and proposed layout. For parks with two or more lots, the application must also include a professionally prepared map covering site layout, neighboring properties, access routes, utility plans, and notable land features such as flood-prone areas or steep slopes.
Plain English — not legal advice.
Operators and developers planning a mobile home park in Barton should be aware that § 97-30 requires a preliminary permit application to be filed with the Town Clerk before any park development proceeds. A compliant applicant assembles all required documentation — including legal property descriptions, deed references, tax map designations, and, for parks of two or more lots, a map prepared by a licensed architect or engineer — and submits the nonrefundable filing fee at the time of filing. Once the completed application and fee are received, the submission is placed on the agenda for the Town Board's next regularly scheduled meeting for further review.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Section 97-30 of Barton's mobile home park ordinance governs the earliest stage of the permitting process for new mobile home parks, which can be relevant to prospective residents evaluating whether a park has been properly authorized. Tenants or community members who have questions about whether a particular park went through the required preliminary application process under ch. 97 § 97-30 may review public records held by the Town Clerk, since the application and associated documents are filed there. Those with concerns about a park's permitting status may also consider reaching out to the Town Board directly or consulting a tenant-rights organization familiar with local land-use procedures.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API