Albion Village, N.Y., Code of Ordinances ch. 179 (eCode360 ed. 2026) § 179-7
Application requirements; fees
Operative Text
A. All applications for permits or for renewal of permits shall be submitted to the Village of Albion Bureau of Code Enforcement and Fire Prevention. B. All original applications for permits shall contain the following: (1) The name and address of the applicant; if the applicant is a partnership, the names and addresses of the partners; if the applicant is a corporation, the names and addresses of the officers and directors. (2) The name and address of the owner of the land. (3) The location and legal description of the mobile home park. (4) Two sets of engineering and/or architectural plans and specifications of the proposed park showing: (a) The area and dimensions of the tract of land. (b) The number, location and size of all mobile home lots. (c) The location and width of roadways and parkways. (d) The location of service buildings and any other proposed structures. (e) The location of water and sewer lines and riser pipes. (f) Plans and specifications of the water supply and refuse and sewage disposal facilities. (g) Plans and specification of all buildings to be constructed, altered or extended within the mobile home park. (h) The location and details of lighting and electrical systems. C. All applications for permits or renewals of permits shall be accompanied by the deposit of a fee as set forth from time to time by resolution of the Board of Trustees. D. Upon review of the application and subject to evidence that the mobile home park meets the minimum requirements of the New York State Department of Health, the Village Board shall issue or renew a permit when a review of the application and inspection of the site demonstrates that the proposed or existing mobile home park meets the requirements of this chapter. E. All applications for original permits shall be reviewed by the Planning Board of the Village of Albion for approval before being submitted to the Village Board of Trustees pursuant to § 179-7D of this chapter.
Section 179-7 of Albion Village's Code of Ordinances establishes the procedural requirements for obtaining or renewing a mobile home park operating permit. Applicants must submit detailed documentation—including ownership information, engineering or architectural plans, and descriptions of utilities and infrastructure—to the Village's Bureau of Code Enforcement and Fire Prevention, along with a fee set by the Board of Trustees. The Village Board may issue or renew a permit only after confirming the park meets both state health standards and local chapter requirements, and original permit applications must first pass through the Village of Albion Planning Board before reaching the Village Board of Trustees.
Plain English — not legal advice.
Operators of mobile home parks in Albion Village must comply with the application framework set out in § 179-7, which requires submitting two complete sets of engineering and/or architectural plans covering lot layouts, roadways, utilities, lighting, and structures to the Bureau of Code Enforcement and Fire Prevention. A fee established by Board of Trustees resolution must accompany every application or renewal. Compliant operators ensure that new park applications are routed through the Planning Board for approval before the Village Board of Trustees acts, and that all facilities satisfy New York State Department of Health minimums prior to inspection.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Section 179-7 governs how mobile home parks in Albion Village are permitted and renewed, meaning the park where a tenant resides should hold a valid permit issued under this process. Tenants who have concerns about whether a park is properly permitted—or whether it meets the health and infrastructure standards required for permit issuance—can inquire with the Village of Albion Bureau of Code Enforcement and Fire Prevention, which receives and reviews these applications. Tenant-rights organizations or local housing advocates can help residents understand what permit records are publicly available and what options exist if a park appears to be operating without a valid permit under § 179-7.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 9, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References In
Rules and statutes that cite this regulation
Related Rules
Source Information
Use this in your app
Access this data programmatically via our API