Hillside — Ch. 18 Art. XIII Condominium Conversion § 18-583

Required submittals

In Force
Verified 11/6/2026 · Next check 12/6/2026
HillsideCondo Conversion

Operative Text

Hillside — Ch. 18 Art. XIII Condominium Conversion § 18-583
(a) The developer shall submit information documenting that the project as a whole will be in good repair on the interior and the exterior when offered for sale. As part of the material necessary for the village to determine this to be the case, the reports and/or information required by this section shall be submitted. The developer shall pay the cost of all reports. The reports shall include information on what improvements, if any, shall be accomplished by the developer and at what point in the conversion proceedings such improvements shall be completed. The village board shall consider all improvements cited in the reports, whether required or voluntary, conditions of approval.
The developer shall be responsible for submitting the following documents for consideration of the conversion of multiple-family rental housing to condominiums: (1)
Schedule of proposed improvements which shall be made to the project prior to their sale; such list shall not prohibit the facility owner from making additional improvements;
(2) Submittal of a Plat of survey of the project including the location and sizes of structures, parking layout and access areas.
(3) Submittal of a of the proposed subdivision plats of survey (referred to as a final map) for the complex distinctively outlining areas that will be privately owned by unit owners and those areas of the facility that are common elements and regulated by the board of managers of the unit owner's association.
(4) Submittal of landscape plan.
(b) Physical elements report. A report on the physical elements of all structures and facilities shall be submitted, containing the following:
(1) A report by an Illinois-licensed architect and structural engineer, when required, detailing the structural condition, useful life, and any apparent deferred maintenance of all elements of the property, including, but not limited to, foundations, electricity, plumbing, utilities, walls, ceilings, windows, frames, recreational facilities, sound transmissions of each building, mechanical equipment, parking facilities, and drainage facilities. Such report also shall describe the condition of refuse disposal facilities; swimming pools, saunas, and fountains; stone and brickwork; fireplaces; and exterior lighting.
(2) A report by a licensed mechanical contractor detailing the age, condition, expected size, and the cost of replacement for each appliance and mechanical equipment for heating and cooling. The report shall identify any defective or unsafe appliances and set forth the proposed corrective measures to be employed.
(3) A report by an Illinois-licensed structural termite and pest control specialist certifying whether or not all attached or detached structures are free of infestation and structural damage caused by pests and dry rot. The report shall describe what procedures would be necessary to eliminate infestation or damage, if present.
(4) A report by an Illinois-licensed roofing contractor verifying the condition of the roofs of all structures and an estimate of the remaining physical life of the roofs and the cost of replacement.
(5) A declaration of the covenants, conditions, restrictions, and rules and regulations which would be applied on behalf of any and all owners of condominium units within the project. The declaration shall include, but not be limited to: the conveyance of units; the assignment of parking and storage areas; and an agreement for common area maintenance, together with an estimate of any initial assessment fees anticipated for such maintenance, and an indication of appropriate responsibilities for the maintenance of all utility lines and services for each unit.
(6) The proposed price of each of the units;
(7) The proposed homeowners' association budget, detailed to include fixed costs, operating costs, reserves, administration, and contingencies.
Source: Legislative text reproduced verbatim
Plain English

Section 18-583 of Hillside's Chapter 18, Article XIII governs what a developer must submit to the village before converting a multi-family rental property into condominiums. The required package includes surveys, landscape plans, a schedule of planned improvements, and a series of professional inspection reports covering structural integrity, mechanical systems, pest control, and roofing. All improvement items identified in those reports—whether required or volunteered by the developer—automatically become conditions of the village's approval, and the developer bears the full cost of obtaining the reports.

Written by anthropic/claude-sonnet-4.6 · Reviewed on November 6, 2026

Plain English — not legal advice.

For Property Managers

Developers pursuing a condominium conversion under § 18-583 are generally expected to assemble a comprehensive submittal package before seeking village board approval. That package typically includes a plat of survey, a landscape plan, a proposed improvement schedule, and licensed-professional reports on structural condition, mechanical equipment, pest infestation, and roof life, along with a proposed unit price list, a draft homeowners' association budget, and a declaration of covenants and restrictions. Because every improvement mentioned in those reports—voluntary or otherwise—becomes a condition of approval under this section, compliant operators tend to review all reports carefully before submission to ensure accuracy and completeness.

General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.

For Tenants

Renters living in a building undergoing condominium conversion in Hillside should be aware that § 18-583 requires the developer to document the property's physical condition through multiple licensed-professional reports before the village board can approve the conversion. These reports cover structural elements, mechanical systems, pest control, and roofing, and any deficiencies identified must be addressed as conditions of approval. Tenants who have concerns about whether required submittals were properly filed or whether identified deficiencies are being corrected may contact the Hillside village board directly or reach out to a local tenant-rights organization for guidance on available options.

General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.

Generated November 6, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.

Effective Timeline

Click on timeline segments to view historical versions.

References Out

No outbound references recorded yet for this provision.

References In

No inbound references recorded yet for this provision.

Related Rules

§ 10-2.1
Definitions
§ 5-4-1-2
PURPOSE, DECLARATION OF POLICY
§ 5-4-1-5
APPLICABILITY OF PROVISIONS

Source Information