Shelton, Conn., Code of Ordinances ch. 8 § 8-143
Premises to be properly graded
Operative Text
All premises shall be graded and maintained as to prevent the accumulation of stagnant water thereon, or within any building or structure located thereon.
Section 8-143 of Shelton's Code of Ordinances, Article VI, requires that all properties be graded—meaning shaped or sloped—so that water does not pool or collect on the land or inside any building or structure on it. The rule applies to both the outdoor grounds and any enclosed structures. Stagnant water accumulation, whether on the surface or within a building, is a condition this provision is designed to prevent.
Plain English — not legal advice.
Under Shelton Code ch. 8, art. VI § 8-143, compliant property operators generally ensure that their land is graded with adequate slope or drainage features to direct water away from structures and prevent pooling. Routine inspections of drainage patterns, especially after heavy rain, are a common practice among operators who maintain compliance. Addressing low spots, failed grading, or blocked drainage channels before water accumulates is consistent with the standard this provision establishes.
General guidance for property managers — not legal advice for your specific situation. Consult an attorney for advice on your case.
Section 8-143 of Shelton's Code of Ordinances establishes that tenants have a right to occupy premises where the grounds and structures are maintained to prevent stagnant water buildup. If a tenant observes persistent water pooling on the property or inside a building, that condition may constitute a violation of this provision. General enforcement paths can include notifying the landlord in writing, contacting Shelton's local code enforcement or housing inspection office, or reaching out to a tenant-rights organization for guidance on available options.
General guidance for tenants — not legal advice for your specific situation. Consult a tenant-rights organization or attorney for advice on your case.
Generated November 11, 2026 — auto-generated, not yet human-reviewed. See /transparency for methodology.
Effective Timeline
References Out
No outbound references recorded yet for this provision.
References In
No inbound references recorded yet for this provision.